4–6 Dec 2017
CERN
Europe/Zurich timezone

Operations of the REX/HIE-ISOLDE linac during the 2017 Physics Campaign

6 Dec 2017, 11:30
20m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map

Speaker

Jose Alberto Rodriguez (CERN)

Description

The High Intensity and Energy ISOLDE project (HIE-ISOLDE) is a major upgrade of the ISOLDE post-accelerator at CERN. Phase 2A of the project was completed in June 2017 when an additional cryomodule and the third High Energy Beam Transfer line (HEBT) were installed and commissioned. The 2017 Physics campaign started immediately after. Multiple stable and Radioactive Ion Beams (RIBs) were delivered to two different experimental stations and a total of twelve experiments were completed. The main issues and the operational highlights for each of the experiments as well as the reliability of the different subsystems of the linac and possible future improvements and upgrades of the machine will be discussed in this presentation.

Author

Presentation materials