Breakdown studies meeting 05.09.2017
Present: Walter Wuensch, Iaroslava Profatilova, Noora-Mari Pienimaki, Mike Barnes.
Remote connected by Vidyo: Anton Saressalo, Flyura Djurabekova from University of Helsinki.
Sagy Lachmann from Hebrew University of Jerusalem,
Oleg Kondratiev from Energy Pulse Systems.
Speakers: Anton Saressalo, Noora-Mari Pienimaki, Sagy Lachmann, Iaroslava Profatilova.
Link to indico page https://indico.cern.ch/event/663425/
Agenda
1. Anton shown the latest results from LES used at Helsinki. The Hard Cu electrodes are used there. The initial conditioning curve is shown. The electric field is reached the value ~ 82 MV/m during 1E8 pulses and ~ 800 BDs. After this, the generator was broken. It seems the last Behlke switch was damaged. The behaviour of conditioning curves during the tests at CERN and at Helsinki were compared.
Also Anton shown the results from the analysis number of craters at the electrodes using MATLAB script (previous tested electrodes). The plans for this electrodes set was discussed. Flyura proposed disassemble vacuum chamber and check the distribution of craters at the surface. Also the possibility of test with new method of surface treatment in collaboration with another team was proposed by Flyura.
Sending the Marx generator to Helsinki was discussed and agreed. If the date for Oleg working trip to CERN will be soon, the Marx generator #1 will be sending after improvements, otherwise, Marx generator #1 will be send there as soon as possible. Also sending the equipment for dark current measurements was agreed.
Tasks:
1.1. To send the Marx generator to Helsinki as soon as possible.
1.2. to send the manual with commands for starting the software adaptation at Helsinki.
1.3. to send the equipment for dark current measurements.
2. Sagy presented the results of analysis from dark current measurements taken at LES at CERN.
The difference in Gaussian fittings for large electrodes was shown. The addition to the correlated splits the uncorrelated splits for data were observed.
Task:
2.1. To continue to take data and to clarify the method for dark current measurements.
3. Iaroslava shown the differences of ways for implementation of some features for both generators (generator with HRR circuit and Marx generator). The reason of “delay” was discussed. It was mentioned that pulse width, ideally, should be kept the same in non-BD and BD case.
Next breakdown meeting will be on Tuesday, September 26.