Markus Aicheler to present an update on the status of the CLIC Module heat loads.
An update from Pedro Cabral on the CV for CLIC, to include:
1. An update on the paramaters being considered
2. The CV initial proposal.
3. Any required information that is still outstanding
4. Future Steps
Matthew Stuart to present an update on the CLIC Civil Engineering Siting for the 380 GeV and 3 TeV machine as well as an initial update on the First draft of the PiP.