-
Laurette Ponce27/01/2010, 08:30As in 2008, the access system has been used in different configurations all along the 2009 year, following the machine status: shut-down (plus reparation), powering tests period and finally beam operation. The performances following the different evolutions introduced during the year and the issues, solved or still pending, will be reviewed during the presentation. The list of needed...Go to contribution page
-
Julie Coupard27/01/2010, 09:00There are 2 periods where the beams in the LHC machine are stopped; the “Shutdown and Commissioning” period and the “Technical Stop”. This talk will define how these different periods should be organized (scheduling, coordination, safety, access... ), and explain how the access system will be operated for personnel safety.Go to contribution page
-
Marc Tavlet27/01/2010, 09:25The presentation explains the objectives and justifications, as well as the drawbacks of the current LHC sectorisation and the LASS/LACS. The lessons learnt from the September-2008 incident impose more constraints. New constraints linked to safety as well as to exploitation are reviewed. How can the new requests be addressed? Should the sectorisation be revised ? Would that imply more sector...Go to contribution page
-
Rui Nunes27/01/2010, 10:20This paper will address the issues concerning the potential implementation impact of the main types of recent requirements and evolutions, in the light of the return of experience of the operations in 2009. The types of requirements can be divided into three categories: technical improvements, design modification & scope increase, and finally operational & procedural improvement. The phasing...Go to contribution page
-
Timo Hakulinen27/01/2010, 10:45Heavy utilisation of the access system during LHC hardware commissioning has uncovered shortcomings in the performance of the system. While generally available to operation as required, response of the system has sometimes been below expectations of its users and operators. Reasons for these problems are both technical and procedural. Issues have been found in both hardware and software as...Go to contribution page
-
Doris Forkel-Wirth27/01/2010, 11:10The levels of ionising radiation around the LHC injector chain are monitored by the ARCON system (born with LEP), the ones around the LHC by the state of the art system RAMSES. The talk will present the consequences for beam operation in case of technical failures of the monitoring system(s), the strategy chosen to replace ARCON with RAMSES and the corresponding mile stones of the initial...Go to contribution page
Choose timezone
Your profile timezone: