08:30
Scope and results of hardware commissioning to 3.5 TeV and lessons learnt
-
Matteo Solfaroli
-
08:50
Enhanced QPS – Commissioning and performance at 3.5TeV, outlook towards 5 TeV
-
Reiner Denz
-
09:15
Do the splices limit us to reach 5TeV. Plans for 2010 run
-
Michael Koratzinos
-
09:40
Lessons learnt from beam commissioning and early beam operation of the Beam Loss Monitors (+ outlook to 5TeV)
-
Barbara Holzer
-
10:35
How to safely reach higher energies and intensities? Settings and commissioning of Machine Protection Systems for 5TeV operation (BIC, SMP, LBDS, BPM, BCT, PIC …)
-
Jorg Wenninger
-
11:00
What else needs to be done to reach 5 TeV and beyond? Consolidation and commissioning of essential magnet powering systems
-
Walter Venturini
-
11:25
HWC 2010 and beyond – R.Schmidt - 15 min
-
Rudiger Schmidt