Session 7 - Future Upgrade scenarios for the Injector Complex

S07
28 Jan 2010, 08:30
Chamonix

Chamonix

"Le Majestic"

Presentation materials

  1. Michael Benedikt
    28/01/2010, 08:30
    What will this upgrade bring for the LHC in terms of beam (intensity, structure, emittance and quality) ? Realistic construction schedule including timeline for commissioning of the complex until it can deliver at least the present ultimate beam. Reliability issues as well as the cost of construction and operation of the new complex should be addressed.
    Go to contribution page
  2. Simon Baird
    28/01/2010, 09:00
    Even if SPL and PS2 go ahead, it is unlikely that they will deliver nominal LHC beams before the early 2020’s. This means that the existing LHC Injector chain, SPS, PS & PSB, with LINAC4 replacing LINAC2, will have to continue to run with high reliability for more than 10 more years. This talk will examine what additional actions would need to be taken to ensure that the same Injector chain...
    Go to contribution page
  3. Massimo Giovannozzi
    28/01/2010, 09:30
    The situation of the present pre-injection complex will be discussed with particular emphasis on the performance limitations. Mitigation measures will be discussed assuming that substantial consolidation work can be devoted to such improvements. Possible scenarios for the implementation of these measures will be outlined, together with an analysis of the impact on the performance of the LHC machine.
    Go to contribution page
  4. Elena Shaposhnikova
    28/01/2010, 10:30
    The LHC beam with characteristics close to nominal was obtained in the SPS already a few years ago. The main beam-quality limitation comes from the e-cloud effect which seems also to be responsible for high beam losses. During MD sessions in 2008 and 2009 the total intensity of the LHC beam was limited to three PS batches. Intensities above nominal have not yet been seen in the SPS and...
    Go to contribution page
  5. Christian Carli
    28/01/2010, 11:00
    Is there an alternative path for a partial upgrade of the injector complex, for example an RCS or FFAG? What would injection at a higher intensity into the PS bring? Would such a solution bring significant advantages?
    Go to contribution page