    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-PSB ECR PSB-BSG-EC-0002 (EDMS 1875883) New Wire Grid Detector in Sector 4L1 of the PS Booster 15m

      This document describes the proposal for installing a new Wire Grid detector in the PSB sector 4L1, Ring 3

      Speaker: Federico Roncarolo (CERN)
    • 16:25 → 16:40
      LIU-PSB SRR PSB-LJ-EC-0013 (EDMS 1886492) New BPM in the BI Injection Line to the PS Booster 15m

      This document describes the reserved location for a new BPM in the BI PS Booster injection line, to be installed during the Long Shutdown 2 (LS2).

      Speakers: Chiara Bracco (CERN), Christoph Hessler (CERN)
    • 16:40 → 16:55
      LIU-IONS ECR L3-V-EV-0001 (EDMS 1885947) Modification of Vacuum Layout on Line ITFS in Linac 3 15m

      The installation of a new Faraday cup [1] requires the modification of the vacuum layout, removing an old, non-documented, experimental setup.

      Speaker: Dr Jose Antonio Ferreira Somoza (CERN)
    • 16:55 → 17:00
      LIU-IONS ECR CPS-VGP-EC-0001 (EDMS 1887525) temporary Vacuum Pressure Measurement in the ITE Line 5m

      Two new BPMs were installed in ITE vacuum sector (switchyard) in the two arms of the chicane from LINAC3 to LEIR during EYETS 2016-2017 [1]. Secondary charges collected by the electrodes complicate the measurement of the beam position. Among others, one of the possible contributions to this phenomenon is the vacuum pressure. It is proposed to temporarily install a new Penning gauge on the blank flange installed after the removal of E0 line [2].

      Speaker: Jose Antonio Ferreira Somoza (CERN)
    • 17:00 → 17:05
      AoB 5m