- MCH to select and procure new power cable (Solar) and connectors
- MCH to set-up test to validate possibility to inject higher current in present cables
- Next update in two weeks, i.e. around 4th April
- ALICE TC to define with EA plan to drill concrete slab
- EN-EA underlines that design of LV connectors is critical in case of shortcut
Optical fibers:
- Length of LC-LC patch-cords must be re-measured (done Giuseppe/Herve/EL)
- Splitter boxes design: EL to provide standard dimensions and ALICE TC to integrate them in CAD
- MID did not show up at the meeting