Indico celebrates its 20th anniversary! Check our blog post for more information!

14–18 Jan 2019
CERN
Europe/Zurich timezone

The Frascati beam-test facility doubling

16 Jan 2019, 09:40
20m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map

Speaker

Paolo Valente (Sapienza Universita e INFN, Roma I (IT))

Description

The improvements of the Frascati beam-test facility (BTF) are based on the splitting of the existing beam-line: adding a second branch in the BTF it will be possible to run in parallel two different setups. This is realized by splitting the beam with a pulsed 15° dipole (<100 ms ramp) and a two-way vacuum pipe, and with a second set of beam diagnostics for the monitoring of the beam intensity, of the spot size and position.
The project of all new elements, of the improvement of the vacuum, power, cooling and conditioning systems, as well as the modifications to the building has been completed in-house by the Frascati staff, the new elements and vacuum components have been then built. After having completely dismantled the old beam-line, the services and infrastructure of the facility have been revised and upgraded. The beam-line has been finally rebuilt in the new configuration with the new two branches: BTF-1 dedicated to long-term installations, and BTF-2 for shorter duration test-beam activities.

Primary authors

Paolo Valente (Sapienza Universita e INFN, Roma I (IT)) Claudio Di Giulio Luca Gennaro Foggetta (INFN-Laboratori Nazionali di Frascati) Dr Bruno Buonomo (INFN LNF)

Presentation materials