PSB Commissioning Meeting #7

→ Europe/Zurich
Participants: Vincenzo, Bettina, Fanouria, Alan, Simon, Federico, Jean-Francois and Chiara
 
Simulations and priorities for different commissioning scenarios were defined (see slides). Needed following inputs: working point (from Andrea’s loss studies), longitudinal emittance and bunch length in case of no longitudinal painting (Simon). 
Simon will provide RF with a basic scheme for testing the longitudinal painting before the end of this reliability run (no need to start from nominal energy).
We have to organise the meeting with RF (at the end of the reliability run, either just before or just after Xmas depending on people availability). Action for next meeting (all): prepare a list of the open questions, needed clarifications and requests for the RF team.
Need to define a deadline for the first version of the EDMS document. Gian Piero was unanimously named as leading person for this task.
 
 
Status update on commissioning cycle and longitudinal painting (Simon’s slides)
The expected achievements when operating the PSB with single cavity during the initial phases of the beam commissioning are presented. H=1 and 8 kV seems to allow operation within a reasonably large set of parameters in terms of intensity and longitudinal emittance. Small emittance beams lay at the edge of the stability region (microwave instability) and a possible blowup is expected. This effect can be mitigating by using the second cavity (after synchro-loop setup, i.e. a couple of months after the beginning of the commissioning).  
Simon found that the DE of the beam and the bucket tend to diverge during the injection process with longitudinal painting. This could be the reason for the observed structure in the longitudinal  beam distribution after 2000 turns. He is investigating how to treat this in simulations and finally mitigate the effect.
 