User Reports / Overview :
----------------------------------
CO2 Tue 16.4 : strange behaviour of CO2. (drop of CO2 for a few seconds)
Local "Power cut" not understoood yet. Investigation ongoing.
Bunker Temperature : 1 degree drift. Linked to the the cooling water maintenance - to be fixed end of next week.
18.4 : 19h-14h (19.4) : Source off by mistake. User fault.
ALICE : One chamber returned for retesting - Today , finishes at ≈ 11h
ATLAS-MM : SM1-M3 installed in bunker at 2.9m upstream - another 2 week of irradiation planned.
Huge trolley installed yesterday with LM1-M3 - should stay for 2 weeks.
Universal trolley to arrive mid May. Tentative to be placed in current CMS-DT location.
Moving to premixed bottles.
ATLAS - sTGC : Currently working in the preparation area. Next week - QS3 to be installed on Thursday.
Mass production test : planned to be in front of CMS-SCS downstream or on the side.
We check on Thursday.
EP-DT2 : Measurement ongoing. No special request for this week.
CMS-RPC : One trolleys for longevity test and the other for testing the electronics in order to launch the mass production. One installed, one (cosmic trigger) to be installed next week (Thursday). ISEC visit requested.
Gas flow needs to be checked, as we are on the limit. Shared with ATLAS-RPC.
EcoGas - Running dedicated mixer.
CMS-GEM 1&2 : 2 is Happy, some problem one GEM 1n (crate outside was failing) - will be fixed with arrival of new chamber.
EP-DT1: Fine.
ATLAS-RPC : No report - no presence.
CMS-DT MB 1&2 : Preparing for the de-cabling of both chambers expected starting this week.
Removal planned 8th of May.
LHCb : No update.
CMS-CSC: Continuing radiation and recovering the setups from the preparation area.
CMS-RPC : GC requested for weekend or beginning of next week. Will be put in logbook.
==========================================================
Weekly Planning : UPSTREAM
Default filter settings : 2.2
Thursday : CMS - RPC : two hours source scan with ABS = 6.9
EcoGas : 2h with 22 after RPC
Friday : EcoGas : 2h stable 2.2 in the morning
Saturday :
Sunday :
Monday :
Tuesday : ATLAS -MM (morning) 4-5h scan, 1h each from 10-1 attenuation
Wednesday:
-------------------------------------------------------------------------------------------------------
Weekly Planning : DOWNSTREAM
Default filter settings : 1
Thursday :
Friday : Stable conditions for around 3 h (9h-12). Source Off for 2h starting 14h
Saturday :
Sunday :
Monday :
Tuesday :
Wednesday:
-------------------------------------------------------------------------------------------------------
Access Requests :
Thursday : 11h - removal of ALICE Chamber
Improvements needed or planned for the facility.
New Items :
==========
Cleaning of DCS and installation of UPS : to be scheduled.
Ongoing Projects :
=============
Correction of Irradiator Signals after power cut.
Since installation of UPS, the Irradiator signals UNSAFE after a power cut, independently if the source was ON or OFF at the time. In reality, source will always be in safe position after power cut. Power cycle controls in control room to get correct status.
PyTIMBER :
Additional values need to be collected/republished ?
- REMUS - to be included in GIF Display
- XTDV - to be included in pytimber only
News about the ongoing bunker extension
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics
Guidelines for filling in IMPACT requests
List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154
General Guideline : One IMPACT per setup.
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).
NEW IMPACT needed for 2019 !
Issue with ligth. Button near access door should enable the light for additional 2h.
We plan to keep the light over the GIF area active in the near future (change by EN-EL needed) -> NOT FEASABLE
Locked door on Saleve side.
Proposal top remove the cylinder to avoid the guard locking the door during night times. -> Cylinder HAS BEEN REMOVED