    • 09:15 09:35
      Review of last week operation & plans for this week 20m

       

      User Reports / Overview :

      ----------------------------------

      ATLAS - sTGC :   ready for the installation and test of the new chambers arrived. 2 setup ready to be installed upstream.

      ATLAS-MM : still need some time to finish with the installation but everything will be ready by the end of the day. 2 independent setup will be installed downstream . 
            

      EP-DT1:  2 setup installed downstream. Ready to start testing

      EP-DT2 : Out of bunker

      EcoGas :  1 Setup with multiples chambers installed upstream and ready to start testing 

      CMS-RPC :  Setup installed upstream and ready to start testing 
                           

      CMS-GEM 1: Out of bunker. No report


      ATLAS-RPC :  Out of bunker. No report         

      LHCb :  The analysis on the chamber irradiated at GIF++ is starting. More news to come.   

      CMS-CSC: Out of bunker. No report                                                                                       

       

       * Gas supply: all the supply are now open again. There will be a small interruption this afternoon at 2.30 pm on the isobutane line. The cut should be less than half an hour. 

                                                                                        

      ==========================================================

      Weekly Planning :   https://teamup.com/ksvh7dak8mub8k7xpe 

      UPSTREAM : Default filter settings :  starting with 1 and check if it is feasible to use it all the time 

      DOWNSTREAM :  Default filter settings :  starting with 1 and check if it is feasible to use it all the time 

      -------------------------------------------------------------------------------------------------------

       

    • 09:35 09:40
      Long Term Planing - General Items 5m

      Annual User Meeting :  TUESDAY 10.09.2019

      ---------------------------------------------------------

      Gas usage at GIF :  we need to compile a table of gas mixture / consumption

      Gas training courses : ATEX level 1  and F-Gas training courses.
      List of trained people to be collected.
       

       https://lms.cern.ch/ekp/servlet/UNIVERSALSEARCH?ACTION=SEARCH&KEYW=atex 

       https://lms.cern.ch/ekp/servlet/ekp?PX=N&TEACHREVIEW=N&PTX=&CID=EKP000039939&TX=FORMAT1&LANGUAGE_TAG=en&DECORATEPAGE=N

      ---------------------------------------------------------

      To be scheduled : Stop of Gas supply for 2-3 days : to be scheduled (end of the year / beginning of next year)

    • 09:40 09:50
      New requests for tests at GIF 10m

      introduction, goal of the test, plan, needs

      Gas recuperation system to be installed (end of July) - Responsible : Roberto
      4 additional racks in Gas Service area. One containing flammable gas.
      FG detection system to be installed, power needs to be provided.

    • 09:50 10:00
      Infrastructure & Upgrades to the Facility 10m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      New Items :
      ==========

      Cleaning of DCS and installation of UPS : to be scheduled.

      Ongoing Projects :
      =============

      PyTIMBER :

      New improved data plotting and data export under development - will be moved to production site soon

          Additional values need to be collected/republished ?
              - REMUS  - to be included in GIF Display
              - XTDV - to be included in pytimber only

      • LS2 restrictions & interventions 5m
      • Cosmic Trigger 10m
    • 10:00 10:30
      Announcements 30m

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • IMPACTS for 2019 5m

        Guidelines for filling in IMPACT requests

        List of active IMPACT declarations : https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

      • New Announcements 5m
      • AOB 5m