LIU-SPS Machine Coordination Meeting 1/4/2020
Present: Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne.
Matters arising
- Most items from last week's meeting have been followed up. LEIR RF generation is being worked on.
Dry runs and test progress news (Kevin/Verena)
- Dry runs continue where they can; what can be developed and tested remotely is being done. Other dry runs such as the FGC ones, for example, are put on hold and need to be rescheduled once we are back.
Update from logging (Johan)
- Johan has prepared a detailed list of the BI variables where he classified and marked the different variables. The parameters were classified in terms of variables that will need to be logged in the future. A second group of variables are the ones where logging can be stopped or where further clarification is still needed.
- Johan got in touch with Lars for Diamond BLMs for which he got some updates.
- ALPS: everything is preset in NXCALS and is ready; the migration was made and devices are in good shape to be ready in a few weeks
- DOROS: we need to decide what we want to do with the DOROS (there are a few devices equipped with DOROS). DOROS data went into the MDB in the past and was used by the MD people, i.e., crab cavities. For NXCALS there will be no distinction in the future as all data will go to the same place. Verena commented that if devices are operational then we need to continue logging them; this can be easily done with the capacities of NXCALS. Verena suggested a similar approach to what is already done in LEIR; if the data is only interesting for certain MDs, one can have in the FESA class an enable/disable logging property. It will then only publish once enabled. (ACTION: Johan to check this possibility with the DOROS experts).
- MOPOS is not foreseen to be reused. The system will however be left in as worst-case fallback solution. It will not be reconfigured for the new logging at this point as the goal is not to use the system anymore after LS2.
- Wirescanners is being looked at by James.
- SEMs is under discussion with Lars.
- BLMs are also being looked at with Fabio. Johan is preparing this.
- Johan will share his spreadsheet via the link on the Indico page under "Update from logging". Everyone is invited to check through the list of variables and see if they can spot any potential issues, missing variables, unnecessarily logged variables etc. (ACTION: all to check through Johan's list).
Beamline installation status (Antonio)
- Antonio give an update on the status of the beamline installations.
- Antonio moved through the different sectors discussing the different specific items per beamline - details can be found in the slides.
- The sectors foreseen to be treated in week 12 have been postponed by a week to avoid "false" opening and closings. 17 sectors in total need to be postponed.
- Again, Antonio went through sector by sector and highlighted the remaining activities.
- Installation dates will be impacted; the team is investigating if this can be absorbed or whether it needs a complete replanning and rescheduling.
- VSC was just in the process of ramping up. When coming back, one of the two expert teams will no longer be there for the remaining of LS2; hence, VSC will be one team down. Chiara explained that the idea will be to try and extend FSUs from other projects that could come and help. Supports from other machines could also be obtained, but a clear planning can not be made to date.
- Verena asked about a provisional planning. She was wondering by when one could have some answers on the different questions. Antonio said they are targeting for the April 20 as t0, but this is not an official date - the planning is being adapted internally. Verena said at least the readiness dates should be confirmed as much as possible.
- Etienne said that for the beam dump all equipment is at CERN; Etienne stressed that for the beam dump we are talking about a shift in the schedule rather than of an actual delay. Eric said that there will be a bit of delay as some expert in mounting the devices will no longer be there.
SPS Shutdown restart analysis (David)
- David gave an overview over the shutdown restart analysis. Exact days are not available to date so a definite reviewed planning can not be done.
- Planning was well on schedule before the shutdown. Worksite is now in safe mode, similar to X-Mas closure. Impacts interrupted with few exceptions. Machine left in general mode to to access system restrictions.
- David presented all activities that will need to be resumed sector by sector.
- Some extra coordination to be done in 2 for WP2 and WP4 which is quite a hot area and needs to be coordinated carefully once we are back. Chiara commented on the EN-EL readiness, that this will have an impact on VSC readiness as well; Davis confirmed that this is also true for the septa team. Installation for the ZS was foreseen for this week. Eric stressed that the refurbishments of the Monte Charges need to be well coordinated with the RF installations after the restart, as these will be needed. David took note of this. The time for refurbishment can not be reduced so this will lead to a shift of the planning.
- BA5 needs a good check as well as it is heavily impacted. Sequence for the installation of the dump needs to be respected. BA5 is a hot zone in terms of activities. David stressed that most of these installations, in particular for the beam dump, will not result in an actual delay but rather a shift, as the planning itself will not need to be reorganized. Etienne stressed that one of the big concerns here and could still lead to a delay is CV, which relies on external contractors; their availability will be critical.
- Loic provided a detailed list on EPC works, status and what is still to do. Loic said that all is on track, except for EIS upgrades which still need some modifications. Activities need to be shifted. David asked about reorganizations; Loic replied that he expected the impact of the shutdown to result primarily in a shift. There are only two activities, during the testing period, which rely on contractors and would consequently potentially need to be reorganized.
- In general, there are many external contractors where their availability and conditions are not entirely clear yet. All open activities are listed in the backup slides.
- Chiara asked about LS2 where she remarked that there are many overlapping activities; she was wondering whether there were any changes in the sequences foreseen. Davis stressed that the sequence are left unchanged.
AOB
Next meeting: 08/4/2020 (Verena)
Draft agenda
- DSO test planning. scope and needs from equipment Stephane/Jame
- MKP temperature and pressure cycles in view of scrubbing Francesco/Bren
- Summary of OP SW development status Fabio/Verena/Kevin