LIU-SPS Machine Coordination Meeting 8/4/2020

Present: Anthony Rey, Brennan Goddard,Chiara Pasquino, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Greg Hagmann, Fabio Follin ,Francesco Maria Velotti , Giulia Papotti ,Gregoire Hagmann , Hannes Bartosik , Ivan Karpov, James Ridewood ,Johan Dalla-Costa, Kevin Shing Bruce Li ,Lars Jensen, Luciana Kolbeck, Marine Gourber-Pace, Reyes Alemany Fernandez, Stephane Cettour Cave, Verena Kain, Yannick Le Borgne, Heiko Damerau.  

Matter arising

TI 2 re-alignment requirement analysis results to be discussed in this forum. Sylvie's budget proposal to be analysed by various work package holders. Brennan will send around Sylvie's proposal after the meeting.

First ideas on when/how to come back from confinement on 17th of April. First ideas: start beginning of May with first people back at CERN. Middle of May people back in the tunnel. 

Update on Action from last meeting: DOROS needed for crab cavity MDs and will be logged into NXCALS. Need to have functionality on FESA class to switch on/off logging. 

Dry runs and test progress news (Kevin/Verena)

Dry run planning to be updated for next meeting taking the confinement  into account. Current dry run planning OSS web tool; but does not seem to update. 

Availability of RF function FESA class is becoming crucial now. RF software team to put more man power on it? Action: Andy, Kevin.

MKP temperature and pressure cycles in view of scrubbing (Francesco/Bren)

LSTM and CNN1D networks to predict MKP temperature from a sequence of intensity and temperature inputs binned into 5 min bins. Most promising sequence length 20 bins. LSTM configuration seems to predict physics better with big inertia. For more accurate models need to have finer temperature sampling. Limited valid temperature range with currently used data. Would be useful for having data from other scrubbing periods. With current LSTM model can predict reliably about 200 bins into the future. Ideally there will be GUI available in the control room for the scrubbing run that helps to plan the next 12 h. 

Discussion: Kevin asked whether using the data backwards could increase the number of available datasets. Brennan answered that this would not replicate the scenario that they would want to learn. Eric asked whether the hardcoded threshold of 60 degrees should also be come LSA settable (Action: Eric, Bren, Francisco). 

Summary of OP SW development status (Fabio/Verena/Kevin)

A codimd page was prepared to follow the progress of the software status in the SPS. The software tools are grouped according to system or functionality. Work is ongoing on several fronts and many tools/frameworks are quite well advanced. An impressive amount of software needs to be ready for the start-up. Many of the totally upgraded systems are already available in software tools (BLMs, ALPS, ATIMs, ...). FESA class readiness or availability of hardware installed in crates is nevertheless a bottleneck. This needs to be highlighted to the management Action: Brennan, Marine. 

AOB 

Next meeting: 15/4/2020 (Brennan)

Draft agenda

  • Status of integration of beam dump system in CCC Eric
  • Tomography in the SPS: what and how? Tomoscope application: what is needed? status? Guilia
  • SPSQC: event building and dry runs scope/planning Verena/Fabio
  • Turn-by-turn interlock with ALPS: visulisation, treshold management, etc. Yannick
There are minutes attached to this event. Show them.
    • 09:00 → 09:10
      Matters arising and actions 10m
    • 09:10 → 09:20
      News on dry-run and test progress 10m
    • 09:20 → 09:35
      MKP temperature and pressure cycles in view of scrubbing 15m
      Speakers: Brennan Goddard (CERN), Francesco Maria Velotti (CERN)
    • 09:35 → 09:50
      Summary of OP SW development status 15m
      Speakers: Fabio Follin (CERN), Kevin Shing Bruce Li (CERN), Verena Kain (CERN)
    • 09:50 → 10:05
      Round table/AOB 15m
    • 10:05 → 10:20
      Agenda for next meeting 15m