LIU-SPS Coordination Meeting

→ Europe/Zurich
Vidyo

Vidyo

LIU-SPS Machine Coordination Meeting 29/4/2020

Present: Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne. 

Matters arising and actions

  • Meeting has been schedule to discuss early dump integration for the SIS; no news yet.
  • EN-ACE to take up planning of restart after lock-down; presenting now regularly at every SPS MCM to distribute information.
  • Power limits actively being discussed in followed-up internally in RF. Will come back to give regular updates.

News on dry-run and test progress  

Status on schedule update (David):

  • Start step 2 is 18th of May --> ramp-up over 16 weeks
  • DHs approved list of activities that can be carried out during step 1
    • EN activities
    • TE activities: Chiara added that VSC will start tomorrow morning in BA3; access point in BA3 is still out of service --> only VSC can work there at the moment
    • BE activities: BE-ICS WP2 was not approved - this is on the critical path and might have an impact on the schedule; WP2 would need one 1week to ramp up and additional weeks to work alone in BA2 (ACTION: Brennan to check how best to follow-up on this. Chiara confirmed that there are other actions impacted by this and that this would indeed result in an actual delay)
    • Gradual ramp up during step-2 could have a direct impact on the remaining duration of LS2 - there will be a special LS2 meeting dedicated to this.
    • Chiara asked about certain actions that can not be done but were mentionedon David's list; david said these would be discussed in more detail this afternoon in a dedicated meeting. Can give an update next week.

RF diagnostics interface for the CCC (Luci):

  • Luci presented how the FESA devises are organized and how OP tries to subscribe to the different devices
  • Proposal for adding different data analysis tools: Elena suggested to also have the possibility to display power limits and power measurments
  • Giulia added to look into integration of OASIS signals (Andy could be involved in this discussion)
  • Heiko asked about average power over various times; would it be possible to look at this moving across just a single cycle (ACTION: Kevin to check this possibility)

Parameter model long. damper (Kevin)

  • Parameter model obtained from RF-FB
  • Proposal to implement rule in software and cross-check them in graphs; establish hierarchies and link once parameters can be imported from HW
  • Re-phasing parameters have been compile along with value generation; some details to be sorted out. Number of settings very overseeable. Again, proposal to import directly from HW and implement vlaue generators for these 20- parmeters then.

Round table/AOB  

  • Chiara:
    • Starting activities in tunnel
  • Elena:
    • Continuing internal meetings in two directions - RF power, Heiko will comment on this. Second direction is RF measurements for 200 MHz HOMS in BSE and tunnel; work being discussed over several teams in RF. Can give update in a few weeks on measurements of impedance, detuning effects which are important for the voltage calibration that we can expect to get in future; power couplers etc.
  • Eric:
    • The second Thales amplifier is purchased
  • Etienne:
    • EN-EL discussion how to restart cabling activities in BA5. First version of early beam dump class (ACTION: Eric to get in touch with Nicolas Magnin)
  • Giulia:
    • Discussions on feedback team for tomography are taking off; Stephane Rey is looking at what is available on the market for the missing HW components
  • Hannes:
    • Final sequence checks ongoing for optics tables (ACTION: check BA1 BPMs data in the sequence, whether these are already up to date)
  • Heiko:
    • Internal meeting on power requirements are being continued; reference scenarios for different beams. Additional computation available for FT beam and estimates for ion beam. Aim is not to miss any scenarios. Idea is to summarize this in some document. Meeting with Eric and Philippe on their observations and protections; presently all under discussion. There will be several layers of protection. Observation side of this, RF is putting together a proposal to obverse the RF power over different time scales to be available as observation also to OP and generate warning levels before things switch. Pre-calculation tool for estimating power would be a different stream. Elena commented to have Hannes' suggestion as part of provided algorithms. Hannes mentioned this is the same for the rms power; but for this we have a tool that allows to compose the supercycle beforehand and to predict that this will not actually raise any alarms in theory. Kevin added this should probably come in a whole package for OP to be able to anticipate power levels and limits during supercycle composition, to compare requested power levels with measurements and to be real-time warned if power limits are approached.
  • Ivan:
    • Discussion between Philippe, Ivan and Themis on transients to take this into account for power requirements.
  • Lars:
    • Testing with JC the new PM data publication. PM push is working for BCTs etc. Work on new SBDS BTV has started in the lab. Engineering spec document is being worked on for the new BPMs.
  • Reyes:
    • On their side having LIU ions meeting - activities are ongoing. Reyes mentioned that because of confinement; extraction line magnets towards LEIR, which were scheduled for September 2020 might not actually take place at this time. Otherwise preparing for re-start up. Addressing activities what can take place before t0 day. Following up sequential steps to restart up machine. (ACTION: SPS to check ramp up from a given time t0 with HWC)

Agenda for next meeting

  • Status on schedule update (David)
  • Roundtable
  • References settings and measurements (Anthony)
  • Status of turn-by-turn interlock with ALPS: visualisation, threshold management, etc. (Yannick)
  • Plans for 200MHz cavity measurements (Christine)