LIU-SPS Coordination Meeting
Vidyo
LIU-SPS Machine Coordination Meeting 13/05/2020
Present: Alexandre Lasheen, Anthony Rey, Antonio Grande Mallavia, Brennan Goddard, David Mcfarlane, Elena Chapochnikova, Eric Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Giulia Papotti, Hannes Bartosik , Ivan Karpov, James Ridewood, Johan Dalla-Costa, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Philippe Baudrenghien, Reyes Alemany Fernandez, Stephane Cettour Cave, Verena Kain, Wolfgang Hofle, Yannick du Borgne, Christine Vollinger
Matters arising and actions
Feedback from LIU executive meeting: HWC planning update to be prepared according to new schedule for SPS coordination meeting in two weeks. This needs to be fed into the final schedule to be presented on the 12th of June.
Update on schedule by David: COVID online course available and to be taken by everyone coming to CERN. WP2 started work in BA2. No confirmation yet from irradiated cabling campaign. Should start beginning of July otherwise knock-on effects. 4 new vacuum sectors added to dashboard in phase 0. BA5: still waiting for confirmation for several activities for e.g. beam dump and access system. Overall planning status seems to be in good shape and most aspects so far fitting into proposed schedule.
News on dry-run and test progress
Kevin is working on a new dry run schedule for the months of June and July under the assumptions that these dry runs will go back to the CCC. Risk analysis might have to be carried out depending on the number of people required in the CCC. Brennan mentioned that he is following up with Rende concerning CCC safety measures. Reyes mentioned that the LEIR control room could also be envisaged in case more space is needed.
PS to SPS Iongitudinal transfer: status, plans, tools, simulations and MD (Heiko Damerau)
Status of understanding summarised for capture losses and slow losses in the SPS, possible mitigation in the PS and SPS reiterated from results of review end of 2017. Simulation proposals for PS and SPS given. Deadline end of 2020. List of required MDs for post-LS2 presented.
Brennan asked when the decision point will be to build some of the possible mitigation measures in time before LS3. Verena mentioned that 2021 - given the short year - might not be ideal for these precision long term measurements. Elena commented that the study for the parameters for the most promising mitigation measure (additional RF system in the PS) should start now independently of measurement results as those might take long to get given the careful set up required in the SPS and PS. Hannes asked which type of MDs are required for these studies (dedicated, parallel, long parallel). Alex mentioned that most MDs were done in short parallel MDs estimating losses with the intensity removed by the tune kicker. Elena clarified that ideally it is long parallel MDs with the full flat bottom as well the possibility to slightly accelerate to get a realistic picture. Adequate time should be allocated in proposed beam schedule for these studies in 2021 (Action: Kevin).
Plans for 200MHz cavity measurements (Christine Vollinger)
List of proposed tests presented. They cover 915 MHz status and mitigation proposals, tuning frequencies, feederline characterisation, 630 MHz HOM damping confirmation and cavity R/Q measurement. Planning to perform measurements still being prepared. Additional work load specifically for Eric's team to prepare for measurements. But obviously unique opportunity to measure these properties in this detail. Results might be essential for mitigation proposals e.g. in the case of 915 MHz HOM as commented by Elena.
Round table/AOB
RF is converging on an interlocking/alarms/warnings strategy for the power limits. Lars will put the description of the interlocking implementation in the ALPS electronics in an ECR. First batch of FGCs was migrated from class 91 to 63 for TI2. Testing will most certainly be possible in the first week of June for BA4. UCAP is now available as BLM concentrator. Work is ongoing for the definition of the BLM logging through UCAP.
Agenda for next meeting
- Schedule update (David)
- Optimisation framework for the SPS (Nico)
- Optics and layout respositories (Hannes)
- Update on power interlocking for RF (Ivan/Elena)
- AOB: early dump surveillance SIS (Eric)