Present: Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne.
Matters arising and actions
LIU-SPS Machine Coordination Meeting 15/07/2020
Present: Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, Christos Zamantzas, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne
Matters arising and actions
- Open action: Marine/Eric check with Greg whether also SIS logic provided; Eric waiting for reply from Greg --> check for end August; nothing critical, Greg is on vacation
- Open action: Kevin still to organise discussions between OP/RF to integrate RF power interlocking with BIS/SIS/SPSQC/Big Sister, other applications. RF working on this, report expeced for mid-September; Kevin suggested to discuss the operational handling of interlocks in August.
- Open action: Kevin/Rende to add 4h for ion DSO test --> implemented on IPP slides; now hand over to Rende
- Open action: implications of sharing last week of scrubbing run between NA setting up and scrubbing
- Open action: Jminuit not compatible with JDK11. Verena find other solution.
- Open action: SPS MCM to have an eye on a deadline for solving the hashtag issue in parameter names
- Open action: Wolfgang to clarify with the LLRF team whether all HW requirements are met for 800 MHz slip stacking and whether system is ready in time for tests in 2021
- Done: Philippe/Greg H. do we need to start RF functions still 300 ms easier with new system? --> being actively discussed now
- Done: David to add Christos to list of invitees for IST meeting --> David will check this
News on dry-run and test progress
- RF FG dry runs have taken place
- After discussing with Andrea, the ALPS ring interlock dry run will not be possible for end July; we will dry run the full interlock capabilities then in September (both extraction and ring interlocks)
- Will next need to look into scheduling of SPSQC and RF acquisition dry runs - dates not yet fixed
- Will need to check with Stephane, when the next round of FGC tests should be made
Dry run outcomes for the RF FGs (Kevin, Giulia)
- Quick overview over the last 2-3 RF dry runs which took place over the last two weeks
- Dry runs were made from the 864 lab as CCC was quite full already (SPS access system tests etc.); e-logbook access was blocked - Anthony mentioned that one can use the reference tool for such cases; Kevin commented that this is a very good point and should not be forgotten for future similar tests or dry runs.
- Very useful testing of operational conditions for RF FG; many minor issues found and resolved (slopes handling, timings, concurrent devices, firmware bugs, etc.)
- Full supercycle tested playing total voltage function of SFTPRO - HIRADMAT - LHCPILOT together with synthetic functions on two channels
- APP-ALL application used for monitoring and sending functions, timings, faults --> very useful
- Francesco asked whether the B-Train calibration marker was already being used. Kevin commented that this test was specifically only for the RF B-Train interface which is just receiving and re-distributing what is being distributed from the actual B-Train. He was not sure whether the original B-Train signal already has the calibration marker.
Integration of RF power interlocking: status (Andy)
- Not yet ready --> postponed to September
AOB - Round Table
- Anthony: working with Giulia and testing in LSA the shifting and linking of RF functions for early starting functions (before start cycle)
- Antonio: in BA2 the MSE tank of TE-ABT has a leak and needs to be changed for a spare; this is conflicting with cabling campaign; the team is looking for a slot to do this change
- Christine: the plan for 200 MHz measurements is ready; R/Q measurement will not be possible, no space for bead pull, but everything else; measurements should be started end next week if everything goes well
- David: all going well and according to plan
- Francesco: UCAP server ready for SBDS for BTV analysis; can start playing with this --> Kevin mentioned it would be nice to show here at some point the mechanics, infrastructure and workflow of how to use this UCAP server
- Lars: request for functional specs for the wirescanners; check with James and Stephane; Reyes asked whether the names for instrumentation for LEIR and transfer lines have been changed; she will follow this up with Lars.
- Reyes: finalizing document together with Stephane for polarity measurement procedure on all electrical circuit in LINC3 LEIR and transfer lines; desing study for new stripper foil being launched;
Agenda for next meeting 05/08/20
- Hysteresis modeling integration Nico