LIU-SPS Coordination Meeting
Zoom
LIU-SPS Machine Coordination Meeting 05/08/2020
Present: Anthony Rey,Brennan Goddard, David Mcfarlane, Elena Chapochnikova, Fabio Follin ,Francesco Maria Velotti ,Giulia Papotti ,Hannes Bartosik , Ivan Karpov, James Ridewood, Lars Jensen, Marine Gourber-Pace, Verena Kain, Carlo Zannini, Christine Vollinger.
Matters arising and actions
- Open action: Marine/Eric check with Greg whether also SIS logic provided; Eric waiting for reply from Greg --> check for end August; nothing critical, Greg is on vacation
- Open action: Kevin still to organise discussions between OP/RF to integrate RF power interlocking with BIS/SIS/SPSQC/Big Sister, other applications. RF working on this, report expeced for mid-September; Kevin suggested to discuss the operational handling of interlocks in August.
- Open action: Kevin/Rende to add 4h for ion DSO test --> implemented on IPP slides; now hand over to Rende
- Open action: implications of sharing last week of scrubbing run between NA setting up and scrubbing
- Open action: Jminuit not compatible with JDK11. Verena find other solution.
- Open action: SPS MCM to have an eye on a deadline for solving the hashtag issue in parameter names
- Open action: Wolfgang to clarify with the LLRF team whether all HW requirements are met for 800 MHz slip stacking and whether system is ready in time for tests in 2021
- Open action: WS parameter table to be prepared --> Hannes, Verena, James
- Ongoing: Philippe/Greg H. do we need to start RF functions still 300 ms easier with new system? --> being actively discussed now
News on dry-run and test progress
Fabio is working on the integration of the B-train RF interface in the operational application to save and replay. Hannes mentioned that BI would like to have summary beam parameter table for the SPS wirescanners. This was added to the open actions and will be treated in the upcoming SPS MPC.
SPS transverse coupled bunch instability studies (C. Zannini)
Carlo gave an impressive summary of the current understanding of the transverse coupled bunch instabilities at injection. With the wall and kicker impedance the thresholds and stability behaviour as function of octupole and chromaticity setting can be very well reproduced. For the vertical plane also the tune plays a major role, as already known from standard operation, where QV needs to be adjusted as a function of intensity/injection. Carlo also defined a mitigation strategy based on chromaticity, octupoles and tune (for V). In case it turns out that the required settings lead to lifetime issues other mitigation will have to be considered such as the wideband feedback system. Brennan asked whether a passive device to introduce inductive impedance for stabilisation could be considered. Elena warned that it would not be easy to come up with something that does not have a negative impact on the longitudinal plane. In case the wideband feedback is required, the study needs to be launched in 2023 to be ready for post LS3. Elena wanted to know why the vertical instability was not seen during the tests pre-LS2. Hannes replied that the vertical plane is always close to instability for LHC beams and the proposed mitigation means had already been used in anger during previous years.
AOB
Brennan announced the SPS ORA to take place on the 5th and 6th of October in the afternoon.
David mentioned that the MSE tank with the vacuum leak in LSS2 will probably be replaced next Friday. Arrangements have been carried out to reduce the clash with the EN/EL campaign for the replacement of the irradiated cables. Work package 2,3 and 4 of the fire safety project are almost complete. Beam dump work in LSS5 is progressing well with shielding preparation and re-installation of LSS5.
Francesco mentioned that he is following up with EN-STI how to interlock accumulated intensity on the beam dump. Stefano Pienese from EN-STI should report on this in one of the upcoming SPS MPC.
Agenda for next meeting 12/08/20
The next meeting is cancelled.