LIU-SPS Machine Coordination Meeting 19/08/2020

Present: See attachment. Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne. 

Matters arising and actions

  • Open action: Marine/Eric check with Greg whether also SIS logic provided; Eric waiting for reply from Greg --> check for end August; nothing critical, Greg is on vacation
  • Open action: Kevin still to organise discussions between OP/RF to integrate RF power interlocking with BIS/SIS/SPSQC/Big Sister, other applications. RF working on this, report expeced for mid-September; Kevin suggested to discuss the operational handling of interlocks in August.
  • Open action: Kevin/Rende to add 4h for ion DSO test --> implemented on IPP slides; now hand over to Rende
  • Open action: implications of sharing last week of scrubbing run between NA setting up and scrubbing
  • Open action: Jminuit not compatible with JDK11. Verena find other solution.
  • Open action: SPS MCM to have an eye on a deadline for solving the hashtag issue in parameter names
  • Open action: Wolfgang to clarify with the LLRF team whether all HW requirements are met for 800 MHz slip stacking and whether system is ready in time for tests in 2021
  • Open action: WS parameter table to be prepared --> Hannes, Verena, James
  • Ongoing: Philippe/Greg H. do we need to start RF functions still 300 ms easier with new system? --> being actively discussed now
  • MSE tank exchange was last week, leak detection all OK, no impact on the EN'EL progress.

News on dry-run and test progress

  • Starting again tomorrow with the RF dry run meetings and preparing the September ALPS interlock dry run. Need also to check status for the FGCs. 

SPS performance tracking status (Kevin/Johan)

  • Idea to collect all machines on one web page to be able to correlate across machines.
  • Flexible plotting system with dynamic interaction.
  • A lot of work behind the scenes, to sort out the servers and implementation details.
  • Very powerful possibilities, example shown of the LCH beam exclusion plot of emittance vs intensity
  • FT plots also being prepared
  • Summary table of status, still need 3 plots to be finished and a few to finish off
  • Need to discuss LSS2 loss plots with the ABT team (Kevin, Francesco)
  • Question on per-fill statistics and 'supertable' concept - still to sort out how to do this, for all the data belonging to a specific fill number - need make sure that this is coherent with LHC approach, looking at data in SPSQC (Kevin, Verena, Hannes, Fabio, LHC)
  • Need to plot transmission from PS to SPS, should be in the SPSQC (Kevin, Hannes, Fabio)

WS beam parameter table (Verena/Hannes)

  • Parameters fully defined in the EDMS document
  • WS speed also given, team recall 6 m/s for the small beams, need to check this (James, Lars, Verena)
  • Also need option for very slow speed for single bunch measurements, to check this (James, Lars, Verena)
  • Need to check if the different harmonic number at injection for ions is incorporated, especially for slip-stacking? (Verena, Kevin)
  • Also to check PS changing bunches for IN/OUT scans (Verena, James, ...)
  • Document then should be released after these checks (Verena)

Update on MKP installation in YETS (Brennan)

  • Reviewed 

AOB

  • SBDS major equipment all in place, vacuum now being closed
  • Vacuum work going well, almost done with LSS3
  • Tunnel works basically all on track and going well
  • FGC and SIS, cannot disallow injection because FGC subscription rate is too low (2Hz), so evaluation at start_cycle will already have beam in the machine - implications to be checked (Eric, Verena)
  • In 618 we have one MDHB corrector (one off with large vertical aperture), not needed, can exchange for standard MDHA, propose to exchange it - ECR needed (Stephane, Hannes, Chiara, David, ABT, HE, SU). 
  • Aperture model was being developed by Sonia as part of the layout DB, needs to be checked (Stephane, Verena, Hannes).
  • Scraper specification (operational requirements) needs to be finalised for end September, to go through in MCM (Eric).

Agenda for next meeting 26/08/20

  • Flash of scraper specs Eric
  • Updates from RF meetings Ivan
  • Timing consistency checks in the SPS Fabio/Kevin

 