LIU-SPS Machine Coordination Meeting 26/08/2020

Present: Alexander Huschauer, Andy Butterworth, Anne Funken, Anthony Rey ,Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard,Chiara Pasquino, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti ,François-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti ,Gregoire Hagmann ,Grzegorz Kruk, Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Julie Coupard, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Malika Meddahi, Marine Gourber-Pace, Mauro Taborelli, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Sonia Bartolome Jimenez, Stephane Cettour Cave, Sylvie Prodon, Verena Kain, Wolfgang Hofle, Yannick Le Borgne. 

Matters arising and actions

  • Open action: Kevin to clarify availability of total voltage measurement from LLRF
  • Open action: Verena to organize a meeting end next week for performance tracking and LHC fill statistics
  • Open action: Marine/Eric check with Greg whether also SIS logic provided; Eric waiting for reply from Greg --> check for end August; nothing critical, Greg is on vacation
  • Open action: Kevin still to organise discussions between OP/RF to integrate RF power interlocking with BIS/SIS/SPSQC/Big Sister, other applications. RF working on this, report expected for mid-September; Kevin suggested to discuss the operational handling of interlocks in August --> RF still preparing to finalize topic internally; will ask for reports in one month; then pick up on these
  • Open action: Kevin to check implications of sharing last week of scrubbing run between NA setting up and scrubbing
  • Open action: Jminuit not compatible with JDK11. Verena find other solution.
  • Open action: Wolfgang to clarify with the LLRF team whether all HW requirements are met for 800 MHz slip stacking and whether system is ready in time for tests in 2021
  • Open action: WS parameter table to be prepared --> Hannes, Verena, James --> WS table essentially finished; want to be able to compare with linear WS; asked Federiko whether 1m/s is possible for cross-calibration; waiting for an answer; ions are in there; release as soon as info from Federico is there.
  • Ongoing: Philippe/Greg H. do we need to start RF functions still 300 ms easier with new system? --> being actively discussed now
  • DONE: Kevin/Rende to add 4h for ion DSO test --> implemented on IPP slides; now hand over to Rende
  • DONE: SPS MCM to have an eye on a deadline for solving the hashtag issue in parameter names

 

  • MSE tank exchange was last week, leak detection all OK, no impact on the EN/EL progress.
  • SPS performance tracking - LSS2 beam loss plots; follow up; supertable LHC fill number; discussions ongoing organize a meeting for end of next week.
  • FGC and SIS is ongoing; Eric made some tests yesterday and state of the FGC seems to work; performance needs to be evaluated once there are more FGCs; in principle we should not be doing a GET, then it works. If this works and it means only log files are polluted, it is a viable solution with good performance. Need the green light from EPC.
  • MDHB corrector: Stephane checked with Cedric; Cedric is okay to open and change the MDHB with an MDHA; we need to keep a constant flow of nitrogen and opening must not exceed half a day. Francesco checked that the change would not lead to a loss of aperture. Last point is to check the holes in the ground. Aperture model from LDB and its coherence with MAD-X; this still needs to be started. Would need automatic tools.
  • Scaper spec for end September

News on dry-run and test progress

  • Summary of status and plans for upcoming dry runs are on the slides

Flash of scraper specs (Eric) --> postponed

Update on power requirements (Ivan)

  • RF power for different beams for SPS were computed with a few assumptions (no power transients from LLRF loops, short bunches, perfect synchronism)
  • Maximum voltage calculable for beam with given intensity --> limit is at 9.7 MV without LLRF overhead, i.e., no margin for LLRF loops --> more detailed analysis
  • Effective available voltage depends on phase slip; phase slip factor defines angle of beam induced voltage; more detailed analysis renders higher voltage limits;
  • Power requirement from LLRF evaluated by Philippe and Themis using refined control model
  • Voltage partition is not far from optimum taking power and transients into account at flat top; during ramp, voltage program needs to be optimized; idea is to compute maximum available voltage for given intensity and LLRF overhead --> gives new curves; second part of ramp is limiting for LLRF power requirements; 800 MHz voltage program also needs to be optimized
  • Q: How realistic is assumption of 20% power requirements; Ivan said that for the 4-section cavity this is good, for the 3-section cavity this is actually more;
  • Q: Can this be monitored in terms of additional power requirements, i.e., do we know when more than 20% power is being used by the LLRF --> this should become part of the available diagnostics in the CCC; Elena commented that the idea of RF is indeed to measure and clamp on power which is available; if power is limited, bunches will be displaced from phi_s which will be a problem for LHC;
  • Verena commented that we should see whether or not we are clamped and that we should see the actually voltage! Heiko added that we will have the measurement of the power averaged over one turn; it will be hard to see any transients; we will also see whether it is clamped; Kevin should follow-up whether we will need and whether we will get a measurement of the total voltage.

Timing consistency checks in the SPS (Fabio / Kevin)

  • Giulia added that, though most timings are generated, there are some that are not generatable; transition crossing for example is not necessarily generatable; consistency cannot be checked easily - need really beam for this
  • Verena mentioned that this is a first implementation of checking consistency; if timings would change, this would immediately need to enter into the default generation rules; this will actually be the new regime on how to handle this, where there will be an application where one can update the generation values more dynamically (in work by SMWG)
  • Heiko: Delphine mentioned that she wants to establish reference cycles --> this is the next level of abstraction; the same mechanics (generation --> propagation to child cycles --> check against generated values --> quick update at highest level / reference cycle if values changed) would hold here however
  • Greg: asked if ATIMs can also be used in working sets; Kevin needs to check this with Orson
  • Acquisition of ATIMs is already added

AOB: transfer line optic status (Francesco)

  • Discussion on transfer lines optics - all ready and in MAD-X form
  • For stitch models still some items to be sorted out; want to avoid copying versions from one repository into the other --> looking into this;
  • Verena asked why there are different repositories; this is how it grew
  • Verena mentioned that the XML files are all in one repository; Francesco said that this is now the issues... but it could be a hint to have all in one repo; Kevin added that this was actually done for the BPT, where there was the same discussion.

AOB: SEM and BI stepping motors interface readiness (Lars)

  • SEM and stepping motors --> consolidated electronic modules
  • Understand gains is one crucial item tested on test bench
  • For 2021 we still have to rely on theoretical calibration factors; installation by early October
  • Stepping motors: new electronics to replace obsolete MIDI, still a few remaining building to be equipped --> hope to complete installation tests during September; changes to device names, APIs have been discussed with OP.
  • Verena asked about end September whether Anthony, Serge and Fabio could finish off all that is application development; Lars confirmed that this is the idea; Verena added that she is looking very much forward to the new developments for DC beams

Round Table

  • Etienne: quad has been aligned in point 5 with dogleg; MKDV and MKDH are under vacuum and pump down has started; external shielding for dump is fully installed in open configuration
  • Fabio: new BBQ HWs installed; next week we might have FESA class ready
  • Reyes: staring this week ISTs of new LLRF in LINAC3; SEM grids realigned; with Stephane created polarity meas procedure document for LEIR; stripper foil in TT2 - launched approval procedure for new stripper foil with 4 frames, which will be meeting several new physics needs

Agenda for next meeting (2/09/2020)