Instrument performance (Arda)
- Laboratory instrumentation and tools
- Batch (beam filling pattern) dependency
- Python based analysis taking logging data from NXCALS
- Further details to be analysed (measurement error as function of intensity)
Electronics and related software (Patrick)
- Reminder of complete system (2 detectors per beam), 16 and 24 bit ADC systems in SX4
- Full scale is 5E14 charges
- Full lab system considered critical for further work
- Need to modify analogue electronics for HL-LHC intensities
- Possible option to install 24-bit ADC on surface (split analogue signal in SX4)
- Radiation hardness of 24-bit ADC is unclear
- The future of 16-bit software with aux signals needs to be decided
- The batch intensity (in 25nsec bunches) most critical for DC BCT performance
- Unclear by when the now nominal ~2E11 charges will be exceeded (HL-LHC preparation)
Software (BCTDCLHC2) changes since 2018 (Lars)
- Upgrade Linux to L867 with related FESA3 version
- Software driven acquisition based on 10Hz LTIM event
- Based on functional specifications with request for data at 50Hz (20msec 'scans')
- VD80 sometimes returns fewer than expected data (see slide 2)
- Software wrapper completely rewritten to take into account the missing scans (averages correct)
- Work remaining to make complete FESA3 server with calibration to be estimated
Follow-up:
- Test possibility to install 24-bit ADC in SX4 (splitting analogue signals) (Patrick / Sebastien)
- Provide full-scale test bench in 866 lab (Patrick / Sebastien)
- Organise a follow-up meeting in January 2021 (Thibaut/Diogo)
- Contact Jorg Wenninger to get information about bunch intensity (Patrick)
There are minutes attached to this event.
Show them.