WBTN calibration factors at LHC construction time (Rhodri)
- Reminder of electronics principle (splitting opposite electrodes and delaying one by 10nsec)
- Start and stop pulsing are sampled and provides in-range flags to ADC values
- Tunnel electronics is WBTN with laser diode, surface DAB64x mezzanine is WBTI
- Electronics normalised in FESA server to -1 -> 1 (geometrical values applied)
- Low and high gain values differ (X3 and X1) - average of TI8 electronics installed provides values for SPS->LHC transfer-lines
- Data from refurbished test bench to be checked to decide whether individual factor are needed (combining WBTN/WBTI factors)
- Geometrical factors: offset from centre, scale factors and non-linearity
- Geometrical correction (cross-terms) from EDMS document (covers 40% of aperture)
- Question about best way to handle rotated BPMs by 45 degrees
- Check with Jorg whether still see problems with BPMS (several installed around the LHC). Compare with DOROS values (connected on same BPMs)
- Review the position calculation algorithm (Michal, Manfred and Manuel)
Application of electronics and geometric factors in the FESA server (Manuel)
- Reminder of the different steps (temperature correction (off?), calibration with filling pattern for low and high gains)
- Reminder of the wbtn_X3/X1 for low and high gain (0.159, 0.141) - close to old values TI8
- Question about logging of statuses and calibration values (NXCALS) (to be checked)
- Add unit-tests (test-bench) and common C++ library for position calculation (Standard and Doros). Michal happy to take part in code-review
Latest results from the calibration bench (Michal)
- Some changes to procedure on test-bench
- Data systematically updated and stored on MTF (inforEAM)
- Some work may
- Question whether the old MTF files can be retrieved
LS2 WBTN calibration (Manfred)
- A few slides would be helpful ..
There are minutes attached to this event.
Show them.