Invited: Andy Butterworth,  Anthony Rey , Brennan Goddard,Chiara Pasquino, David Mcfarlane, Elena Chapochnikova, Eric Veyrunes, Etienne Carlier ,Fabio Follin ,Francesco Maria Velotti , Frank Gerigk, Giulia Papotti ,Hannes Bartosik , Ivan Karpov, Ivan Romera Ramirez, James Ridewood ,Johan Dalla-Costa, Jonathan Meignan, Kevin Shing Bruce Li ,Lars Jensen, Loic De Oliveira, Louis Pereira, Luciana Kolbeck, Jaime Espinos, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Stephane Cettour Cave, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, James Ridewood, David Walsh, Patrick Bestman

Matters arising and actions 

  • Still need update from VSC
  • TIDVG interlocking will be added as AOB

News on dry-run and test progress

Final wire scanner application (James)

  • New functionality: up to 5 scans in same cycle, individual bunch selection, auto PM selection
  • No wire protection - use with caution at high intensities
  • Device protection should not be done at the application level
  • No fitting done in application; dp/p needs to be set manually
  • Application works for new LIU rotational devices
  • Logging of emittances and values done on-demand via application; logging already configured
  • Live demo
  • Hannes:
    • Select times of scans in cycle time rather than delays
    • dp/p needs to be though of how to implement this in a more robust manner; error should be small (look into this)
    • Wire protection: BI and explain how protection to be done...; problem is the BID; (ACTION: OP/BI to follow up - should come up with procedures to run WS safely with what we have at the moment; contact Federico, Ray)
  • Reyes:
    • Compatibility with ions should be checked

Sequencer - list of tasks to be adapted (Luciana)

  • Sequencers in the SPS are used to execute tasks that are repeated quite often
  • 80 sequencer based tasks; 40 operational sequences form this
  • Sequences to be updated at start of HWC
  • FGC tasks handled by CO; MP tasks are updated
  • There are no fundamentally new sequences which were added

Dynamic injection pattern update (David)

  • Next step to part to REST architecture on server
  • Possible to define and import new shorthand/bunch patterns --> patterns could be stored in database
  • Dynamic requests --> HiRadMat bunch patterns configured in database; application does not go via database for the moment; one could investigate saving this in the same way that it is done as done for the injection sequencer; creation of bunch pattern through LSA
  • Giulia asked whether this is totally asynchronous now; if you change the pattern at the wrong time, one could have issues (ACTION: follow-up with David on dynamic requests and asynchronicity)

SPSQC status and first test results (Kevin/Fabio)

  • Important milestone achieved with the removal of RDA2; SPSQC can now be deployed and tested on PRO server

AOB: Results and status of TI2 smoothing (Patrick)

  • TI2 vertical profile 20% realigned and finished end of August
  • TI2 radial profile 40% realigned (previous smoothing in 2013) and finished end September
  • 460 elements in total - all done now; last week of smoothing not needed;
  • Further actions needed in the future to define correct torks to work on supports (broken BPMI support)
  • Two BPMIs left with 3 mrad rotation - small but values will nevertheless be given to BI
  • Problem with scheduling work at LHC end of the line; tried to keep maximum of sectors under vacuum, therefore slightly changed the sequence; was too short for LHC and impact on recommissioning was to big. Alignment could finally be done under vacuum so the alignment could fortunately still be done. There was a small leak but this will be repaired in the future. Brennan stressed that it is important to keep EN-ACE in the loop when there are even minor changes.

Round Table

  • Verena: things to follow up offline
  • Anthony: injection classes for RF more or less ready for test! Could schedule a test!
  • Andy: Dry Run for tomorrow in preparation; RF interlocking will give
  • Bren: schedule 2021 still under discussion; hypothesis should be we finish proton run as originally planned bu now HI physics run planned; running until early-November but no FT; LHC proton run will take place
  • Elena: Meeting on emittance blow-up, work ongoing
  • Etienne: all on track, FS and access system tests co-existence worked out well
  • Chiara: slowing down and things are almost done, ISTs are going well
  • David: SPS closed last week for FS tests, completed, mostly successful, access tests progressing
  • Fabio: we have all chassis BLRSPS available;
  • Giulia: fiber optic link for tomoscope; components found after MS;
  • Hannes: MKPL measurements done before and after serigraphy; good agreement between measurements and simulations; Chiara was wondering whether a tank tests is to be expected during March
  • Stephane: FGC 63 tested in coast with transaction trim and this is all working, even via application YASP; modification also implemented and this is also working; FGC 91 tested by end of week; linkrules for TT10 are also compatible with new interlocking strategy

Agenda for next meeting (11/11/2020)

 