Choose timezone
Your profile timezone:
Mandate to the review committee
The committee is invited to assess the readiness of the Fresca 2 cryostat design for starting the production of detailed drawings, with emphasis on the following topics:
1. Is the proposed design at the level of maturity appropriate to start production of detailed drawings ?
2. Is the proposed design compatible with functional and technical requirements ?
3. Is the cryogenic system safe and compatible with existing infrastructure ?
4. Is the assembly procedure well defined and appropriate with the requirements ?