Help us make Indico better by taking this survey! Aidez-nous à améliorer Indico en répondant à ce sondage !

30 May 2022 to 3 June 2022
Campus des Cordeliers - Sorbonne Université
Europe/Zurich timezone

Top-up Injection into the FCC-ee Collider Ring

31 May 2022, 10:10
20m
CICSU

CICSU

Oral presention (by invitation only) FCC-ee accelerators FCC-ee accelerators

Speaker

Patrick James Hunchak

Description

In order to maximize the integrated luminosity of the FCC-ee, top-up injection will be employed. The positron and electron beams will be accelerated to the collision energy in the booster ring before being injected into the collider ring where it will merge with the stored beam. Regular injection maintains an effectively constant beam current and, other than a brief period during the injection process, collision data can be continuously acquired. Two suitable schemes for FCC-ee, each with on- or off-momentum sub-schemes, have been identified in the past and are studied in further detail to find a suitable design for each of the four operation modes of the FCC-ee.

Primary author

Co-authors

Frank Zimmermann (CERN) Leon Van Riesen-Haupt (CERN) Mark James Boland (University of Saskatchewan (CA)) Masamitsu Aiba (Paul Scherrer Institut (CH)) Masamitsu Aiba Michael Hofer (CERN) Rebecca Louise Ramjiawan (CERN) Tessa Charles (University of Liverpool (GB)) Yann Dutheil (CERN)

Presentation materials