28 November 2022 to 2 December 2022
IJCLab Orsay
Europe/Paris timezone

Session

Parallel B - WG1: 1

B
30 Nov 2022, 14:00
Auditorium Joliot Curie (Building 100)

Auditorium Joliot Curie

Building 100

IJCLab Orsay

Presentation materials

There are no materials yet.

  1. Tanmay Sarkar (Universita & INFN Pisa (IT))
    30/11/2022, 14:00
    WG1: Higher Order and Resummed Calculations

    Recent results on alpha_s study in ATLAS and CMS, especially on Energy-Energy Correlation in ATLAS, and mostly jets in CMS.

    Go to contribution page
  2. Fabian Lange (KIT)
    30/11/2022, 14:20
    WG1: Higher Order and Resummed Calculations

    Quark form factors are important building blocks for several processes studied at the LHC, for example Higgs boson production and decay as well as top-pair production. I will present our calculation of massive quark form factors at three loops in QCD including both singlet and non-singlet contributions. After reducing the Feynman integrals in the amplitudes to master integrals, these were...

    Go to contribution page
  3. Joakim Nystrand (University of Bergen (NO))
    30/11/2022, 14:40
    WG1: Higher Order and Resummed Calculations

    The proton and nuclear gluon distribution functions show a strong
    increase at low values of Bjorken x. This increase, if untamed, would
    eventually lead to violation of unitarity. The growth of the gluon
    distribution must therefore at some point saturate. I will review the
    experimental status on saturation at the LHC.

    Go to contribution page
  4. Emilie Li (IJCLAB)
    30/11/2022, 15:00
    WG1: Higher Order and Resummed Calculations

    The cross-sections of diffractive double hadron photo- or electroproduction with large pT, on a nucleon or a nucleus, are calculated to NLO accuracy.
    A hybrid formalism mixing collinear factorization and high energy kt factorization, more precisely the shockwave formalism, is used to derive the results.
    The cancellation of divergences is explicitly shown, and the finite parts of the NLO...

    Go to contribution page
Building timetable...