Speaker
Maurice Dekker
(DEMACO HOLLAND B.V.)
Description
A new accelerator facility called FAIR is being built at GSI in Germany. The accelerator will accelerate all particles of all the chemical elements. SIS100, the main accelerator ring, requires a cryogenic distribution system that consists of tailor-made (project-specific) multiple helium vacuum-insulated transfer lines and valve boxes. An inside of the required cryogenic equipment and associated complexity will be given. The main technical challenges of the project such as heat load, pressure drop, and space will be presented including proposed technical solutions.
Authors
Ms
Rossi Dekker
(DEMACO HOLLAND B.V.)
Maurice Dekker
(DEMACO HOLLAND B.V.)