Choose timezone
                    Your profile timezone:
                    
                
                
            •   A review of the construction schedule, including possible ways to reduce the schedule by about 6 months for each sector.
•   The calculation of contractor’s profit.
•   Possible alternative technical solutions such as permanent shotcrete for some areas of the underground.
•   Consequence of constructing only two experiment caverns.
•   Future collaboration between CERN and ILF.
•   Use of TILOS and reporting features of TILOS.