13–14 Dec 2012
FNAL
US/Central timezone

BNL Quarter Wave Prototype

13 Dec 2012, 09:40
20m
Hermitage Room, Industrial Center Building, 2 East (FNAL)

Hermitage Room, Industrial Center Building, 2 East

FNAL

Batavia, IL

Speaker

Qiong Wu (Brookhaven National Lab)

Description

A technical overview of the BNL quarter wave cavity development and construction at 400 MHz toward a crab cavity for the LHC. Cavity design and present status including deflecting mode characteristics, HOM spectra, damping schemes, coupler configurations and associated choices should be addressed. The cavity fabrication, treatment and recent test results should be reviewed as appropriate.

Presentation materials