- Compact style
- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
Charge:
Review fabrication challenges for the three compact cavities and the present test results
Review present conceptual ideas of the two-cavity cryostat including the tuning mechanisms, Helium vessel, shielding, thermal and mechanical analysis, RF system, controls, alignment, instrumentation and integration. Its future adaptation towards the final LHC system should be addressed.
Review the timeline for fabrication of the two cavity cryostat and respective systems for the SPS tests and the related prototyping effort.
Guidelines to session on cryomodules.
1. Final crab cavity system requirements Interfaces to the LHC accelerator system, cryogenic system, and tunnel infrastructure Thermal conditions, cavity temperature, intercept temperatures, heat loads Cavity arrangement, supporting structure and possibility for alignment, beam-beam spacing and allowance for two beams, how many cavities per cryostat? Constraints from vertical and horizontal crabbing schemes RF coupler and HOM/LOM configurations and constraints Tuner configurations and constraints Instrumentation requirements Cryostat, piping, and helium vessel safety, code compliance requirements
Venue to be announced shortly