Conveners
Discussion I: Fabrication, Schedule, SM18 Testing & Integration
- Erk Jensen (CERN)
Dr
Erk Jensen
(CERN)
14/12/2012, 10:40
Outline of the crab cavity work package within the HL-LHC upgrade including thedistribution of R&D tasks, time line for R&D and construction, cost estimate over the duration of the project, and man power estimates.
Ofelia Capatina
(CERN)
14/12/2012, 11:10
Fabrication of the different types of Helium vessels and tuner systems, their advantage and disadvantages should be reviewed. Challenges in the design choice and fabrication steps along with feasibility of a two cavity cryostat within the specified scheduled should be reviewed and mitigation should be discussed.
Tommy Peterson
(Fermilab)
14/12/2012, 11:40
Fabrication of the different types of cryostat and their advantage and disadvantages should be reviewed. Challenges in the design choice, fabrication steps, integration along with feasibility of a two cavity cryostat within the specified scheduled should be reviewed and mitigation should be discussed.