13–14 Dec 2012
FNAL
US/Central timezone

Session

Discussion I: Fabrication, Schedule, SM18 Testing & Integration

14 Dec 2012, 10:40
Hermitage Room, Industrial Center Building, 2 East (FNAL)

Hermitage Room, Industrial Center Building, 2 East

FNAL

Batavia, IL

Conveners

Discussion I: Fabrication, Schedule, SM18 Testing & Integration

  • Erk Jensen (CERN)

Presentation materials

There are no materials yet.

  1. Dr Erk Jensen (CERN)
    14/12/2012, 10:40
    Outline of the crab cavity work package within the HL-LHC upgrade including thedistribution of R&D tasks, time line for R&D and construction, cost estimate over the duration of the project, and man power estimates.
    Go to contribution page
  2. Ofelia Capatina (CERN)
    14/12/2012, 11:10
    Fabrication of the different types of Helium vessels and tuner systems, their advantage and disadvantages should be reviewed. Challenges in the design choice and fabrication steps along with feasibility of a two cavity cryostat within the specified scheduled should be reviewed and mitigation should be discussed.
    Go to contribution page
  3. Tommy Peterson (Fermilab)
    14/12/2012, 11:40
    Fabrication of the different types of cryostat and their advantage and disadvantages should be reviewed. Challenges in the design choice, fabrication steps, integration along with feasibility of a two cavity cryostat within the specified scheduled should be reviewed and mitigation should be discussed.
    Go to contribution page
  4. 14/12/2012, 12:10
Building timetable...