19–23 May 2025
Hofburg Vienna
Europe/Vienna timezone

Integration of vertex detector services and cooling

22 May 2025, 09:50
20m
Geheime Ratstube

Geheime Ratstube

(a) Talk abstract only MDI Joint effort PED & accelerators

Speaker

Gherardo Ammirabile (Universita & INFN Pisa (IT))

Description

The FCC-ee IR general layout has a compact architecture, designed to respect multiple constraints given by the physics and mechanics of the experiment. To do this, a specific integration study of the vertex detector and central beam pipe services has been launched: it involves 3D printed support with internal air channels and others lightweight structures used both to support the inner vertex detector staves and to allow the routing of the cables and their integration with the ducts of the liquid paraffin for the cooling of the central beam pipe. In addition, to achieve adequate air cooling of the three internal layers, the inlet and outlet ducts have been specifically designed and directly integrated into the supports of the staves, always with the aim of respecting the constraint of low mass material budget and the need to take out the connection buses of the silicon detectors from the inner part.
The presentation will show the layout of the interaction region with a focus on the structure design and problems still being studied in the integration of the various systems.

Authors

Andrea Ciarma (INFN e Laboratori Nazionali di Frascati (IT)) Dr Andrea Moggi (Universita & INFN Pisa (IT)) Daniele Benvenuti (Universita & INFN Pisa (IT)) Fabrizio Palla (Universita & INFN Pisa (IT)) Filippo Bosi (Universita & INFN Pisa (IT)) Francesco Fransesini (INFN e Laboratori Nazionali di Frascati (IT)) Gherardo Ammirabile (Universita & INFN Pisa (IT)) Manuela Boscolo (INFN e Laboratori Nazionali di Frascati (IT)) Maurizio Massa (Universita & INFN Pisa (IT)) Stefano Lauciani (INFN e Laboratori Nazionali di Frascati (IT))

Presentation materials