19–23 May 2025
Hofburg Vienna
Europe/Vienna timezone

Magnet’s circuits and system optimisation update

21 May 2025, 09:40
20m
Trabantenstube

Trabantenstube

(a) Talk abstract only Accelerator technical design FCC accelerator technical design

Speaker

Byamba Wicki (CERN)

Description

This talk presents updated results on optimal powering solutions for the FCC-ee, based on the latest data from the Feasibility Study.
It includes new magnet parameters, CO2-equivalent material mass estimation for environmental assessment and updated power losses with the top-up scheme of the booster.

A global optimisation tool, developed in collaboration with CERN expert groups, is employed to evaluate CAPEX and OPEX trade-offs across beam optics, power converters, cabling, magnets, and infrastructure. With the aim of minimising the global total expenditure.

The study illustrates how system-level choices, influence overall expenditure and performance.

Author

Co-authors

Presentation materials