19–23 May 2025
Hofburg Vienna
Europe/Vienna timezone

Overview of and Challenges for the FCC-ee Fast Pulsed Beam Transfer Systems

21 May 2025, 13:50
20m
Trabantenstube

Trabantenstube

(a) Talk abstract only Accelerator technical design FCC accelerator technical design

Speaker

Giorgia Favia (CERN)

Description

This presentation summarises the feasibility studies conducted for the various kicker systems needed to transfer the beam between the different FCC-ee machines. The selected kicker design is presented, reflecting the most recent updates in system requirements. The feasibility and technology options for both the beamline elements and pulse generators are discussed, with emphasis on the key challenges. Among these are integration aspects and the impact on subsystems, such as pulse transmission cables. Significant effort has been made to harmonise hardware parameters across machines, aiming to minimise the variety of beamline and generator element types. This contribution also outlines the prototyping requirements in preparation for the upcoming detailed technical design phase.

Authors

Presentation materials