Warm powering equipment, control cabling and other services installation (WP16/TE-MPE)

Not scheduled
20m
30/7-018 - Kjell Johnsen Auditorium (CERN)

30/7-018 - Kjell Johnsen Auditorium

CERN

190
Show room on map

Speaker

Sebastien Blanchard (CERN)

Description

The Warm Powering equipment, which includes the Power Converters (PC), Energy Extraction systems (EE), Circuit Disconnector Boxes (CDB), and Powering Interlock Controllers (PIC), is nearing the final stages of installation. This process also involves the setup of control cables, AC power supply, and the technical Ethernet network. The goal is to prepare for the Individual System Tests and Short Circuit Tests. This presentation will describe the installation process and share lessons learned from overcoming various challenges and issues.