Skip to main content
18–22 May 2025
Peppermill Reno
US/Pacific timezone

C1Po1E-05: Commissioning Results of The ESR 2 Compressors at JLab

19 May 2025, 09:15
1h 45m
Exhibit Hall, Tuscany Ballroom

Exhibit Hall, Tuscany Ballroom

Speaker

Christopher Perry (Thomas Jefferson National Accelerator Facility)

Description

The future operation of the 4 kW 15 Kelvin MOLLER experiment at Jefferson lab necessitates an increase of cryogenic capacity at the End Station Refrigerator. The current plant is the former 1.5 kW (4.5 K) ESCAR plant that has been operating at Jefferson Lab since 1995. The existing 1.5 kW plant is not able to support the load for MOLLER and will be replaced with a refurbished plant comprised of the cold box and compressors of the 4 kW ASST-A plant from the Superconducting Super Collider in Texas. This paper reports the commissioning results of the warm compressor system and compares the current performance with past commissioning performance for these compressors when they were part of the ASST-A plant.

Author

Christopher Perry (Thomas Jefferson National Accelerator Facility)

Co-authors

Mr Brendan White (Thomas Jefferson National Accelerator Facility) Jonathan Creel (Thomas Jefferson National Accelerator Facility) Ritendra Bhattacharya Robert Norton (Thomas Jefferson National Accelerator Facility)

Presentation materials

There are no materials yet.