30 July 2026 to 5 August 2026
Natal, Brazil
America/Sao_Paulo timezone

IHEP high power and high efficiency klystron develpment

Not scheduled
20m
Natal, Brazil

Natal, Brazil

Via Costeira Sen. Dinarte Medeiros Mariz, 6664-6704 - Ponta Negra, Natal - RN, 59090-002
Talk Accelerator: Physics, Performance, and R&D for Future Facilities

Speaker

Prof. Zusheng Zhou (Institute of High Energy Physics(IHEP))

Description

The CEPC collider requires approximately 60 MW of beam power, making RF source efficiency a critical factor for overall project cost effectiveness. High-power, high-efficiency klystrons are therefore attractive RF sources due to their superior efficiency compared with other amplifiers. At IHEP, a high-efficiency 650 MHz continuous-wave klystron prototype completed in 2024 achieved a continuous-wave output power of 803 kW with an efficiency of 78.5%. In parallel, a multi-beam klystron targeting efficiencies above 80% is under development and scheduled for high-power testing in 2026. In addition, an energy-recovery klystron with a target efficiency exceeding 85% is being fabricated and will be high-power tested by the end of 2026. For the CEPC linac, high-power S-band and C-band 80 MW klystrons are also under development at IHEP; the S-band design efficiency exceeds 55%, and two prototype variants are planned for testing in early 2026.

I read the instructions above Yes

Author

Prof. Zusheng Zhou (Institute of High Energy Physics(IHEP))

Presentation materials

There are no materials yet.