106th BLM Thresholds WG meeting (Limitations during operation and IR3 studies)

Europe/Zurich
Zoom

Zoom

Anton Lechner (CERN), Belen Maria Salvachua Ferrando (CERN), Daniele Mirarchi (CERN), Sara Morales Vigo (CERN)
Zoom Meeting ID
67383961250
Host
Sara Morales Vigo
Useful links
Join via phone
Zoom URL

Participants: Anton, Sara, Belen, Fabian, Daniele, Natalia, Cedric, Birk, Katie, Pierre Alexandre Thonet

 

Summary of beam loss limitations for operation - Daniele Mirarchi 

  • Main limitation now -> broken hierarchy at start of ramp
    • Main correlation found -> octupole sign and strength 
    • MF raised from 0.6 to 0.8 in BLMs most limiting as a temporary measure
  • Warnings during the ramp
    • TCL.6R5.B1, TCTPV.4R8.B1
    • Warning disappear after FT corrections applied
    • At start of year, decided not to apply any changes, as it is due to e-cloud conditioning in rotated XRP and MKI
    • Ratio to dump decreasing along the year indeed
  • Warnings in stable beams
    • TCTPV.4R8.B2
      • Identified possible correlation with BLM orientation -> see talk by Belen
    • TCL.6R5.B1
      • Probably linked to e-cloud conditioning at rotated XRPs
      • To be followed up 
  • IR6 asymmetric losses
    • Higher losses due to broken hierarchy
    • TCSP becomes secondary stage of TCSG.6R7.B1 that became primary
    • B1 settings are identical to 2024
    • Less than 1 sigma larger settings than with nominal beam size, still a lot of margin

 

Findings on TCTPV.4R8.B2 BLM - Belen Salvachua

  • Observed increase signal on TCTPV.4R8.B2 BLM, nearly a factor of 2 for the same luminosity compared to previous years
    • Increase of signal was assumed to be due to physics debris
  • Investigation if increase of signal was due to intervention on BRAN 
  • Scraping data with the TCTs taken at injection during commissioning 
    • TCTPV.4R8.B2 IC BLM response higher than expected
    • LIC BLM In same location shows same increase in signal
  • An inspection was carried out in the tunnel
    • TCTPV.4R8.B2 IC BLM was oriented towards the QRL before the YETS
    • Orientation was changed after a vacuum intervention during the YETS, now placed closer to the beam line
  • Plan to make an intervention and correct the orientation of this BLM

 

Scaling of IR3 losses from operational fills - Sara Morales Vigo

  • BLM decomposition calibration at injection energy from 2025 scraping tests used to obtain proton impacts on IR3 and IR7 primary collimators at the start of the energy ramp
  • Hierarchy breakage in IR7 B1 observed at the start of the ramp, with the TCSG.6R7.B1 acting as primary and leaving a different loss pattern in the machine
    • Analysed fill 10678, where the peak of losses appears to be mainly in IR3
    • Analysed also fill 10709, where the peak of losses is shared between IR3 and IR7, for comparison
  • Scaled the BLM ratios to dump recorded at the moment of peak IR3 loss to 200kW -> Whole ring
    • Main limitations in IR3, cells 4, 5 and 6, as expected
    • BLMTI.04R2.B2E10_TCTPV.4R2.B2 and BLMTI.04L5.B1I10_TCTPV.4L5.B1 also limiting
    • Limitations found in IR6 and IR7 BLMs are expected to be linked to the operation with broken hierarchy -> not expected to limit if the nominal operation is restored
  • Daniele comments that it would be good to check if other RS are expected to saturate. This analysis will be done as well. 

 

AOB - Belen Salvachua

  • Issue with the cables that bring HV to SEM and LIC BLMs in 4L6 
    • Several cables changed during intervention, problem could not be solved
    • IC BLMs in the same positions with a different HV loop, working as expected
    • Location of the short circuit not found, expected to be further in the dump line
    • Connections there welded, will require a longer intervention
    • SEMs there in case of a catastrophic scenario with very high losses
There are minutes attached to this event. Show them.