Speakers:
Aleksandr Dmitriev
(Joint Institute for Nuclear Research (RU)),
Alice Marie Goillot,
Antti Onnela
(CERN),
Bartosz Maksiak
(National Centre for Nuclear Research (PL)),
Benjamin Moritz Veit
(Johannes Gutenberg Universitaet Mainz (DE)),
Carlo Ferrari
(Fermi National Accelerator Laboratory),
Clara Matteuzzi
(Syracuse University (US)),
Eva Sommer
(University of Vienna (AT)),
Federico Ravotti
(CERN),
Francois Duval
(CERN),
Giuseppe Pezzullo
(CERN),
Giuseppe Ruggiero
(Universita e INFN, Firenze (IT)),
Graziano Venanzoni
(Universita & INFN Pisa (IT)),
Hans Danielsson
(CERN),
Jan Friedrich
(Technische Universitaet Muenchen (DE)),
Jasper Kirkby
(Goethe University Frankfurt (DE)),
Josef Novy
(Czech Technical University in Prague (CZ)),
Laura Molina Bueno
(Univ. of Valencia and CSIC (ES)),
Martin R. Jaekel
(CERN),
Maxim Alexeev
(Universita e INFN Torino (IT)),
Nikolaos Charitonidis
(CERN), Dr
Oleg Denisov
(INFN, sezione di Torino),
Paolo Crivelli
(ETH Zurich (CH)),
Paolo Martinengo
(CERN),
Roberto Piandani
(Univ. Autonoma de San Luis Potosi),
Salvatore Danzeca
(CERN),
Sergei Gninenko
(Millennium Institute for Subatomic Physics at High Energy Frontier (CL)), Dr
Thomas Poschl
(CERN),
Umberto Marconi,
Umberto Marconi
(Universita e INFN, Bologna (IT)),
Vladimir Poliakov
(Millennium Institute for Subatomic Physics at High Energy Frontier (CL))
-
-
-
-
-
- We completed data taking for neutrino programme. There were several issues that blocked us for few days. We are happy to cooperate with the CEDAR installation/commissioning instructions (or checklist to go through after the installation), so there will be no issues that keep repeating every time we start to use it.
- We are preparing for the data taking with oxygen
- CEDAR was removed
- XSCA table was removed
- Helium tube installed (thanks to David for fast response)
- Vacuum modifications almost completed
- Water target to be safety checked tomorrow by James
Concerning the hydrogen target preparations, there is a possibility that we will need to create one more ATEX zone. There will be a meeting with several groups in order to decide if it is necessary. When decided, we will update ECR and send it for approval. The line for hydrogen has been installed by TE-CRG. EP-DT-DI is working on the the gas mixing and control racks.
Somebody is regularly forcing our door (PPE152).
Possible activity during long shutdown: are there any possibilities in performing magnetic field mapping?
-
-
-