Straw bi-weekly meeting

Europe/Zurich
20/1-004 (CERN)

20/1-004

CERN

15
Show room on map
Hans Danielsson (CERN)
From the same series
1 2 3 4 5 6 7 8 9 10 11 13
    • 1
      Updates

      Short prototype:

      Peter: 

      • currently, the prototype with HV board - HV cannot be increased to a required value (discharges)

       

      Zdenko:

      • testing different readout boards
      • fast RO board - nice signals can be seen 
      • signal 20-40mV, length <100ns, agrees with simulation

       

      Intermediate prototype:

      Tonio&François:

      • test: 2200mm, 400g, 4.6mm with metallization, 5.6mm without metallization - is it the same material?

       

      Long 124-straw prototype:

      Vincent:

      • removed cones from flanges - not needed
      • removed machining from other flanges, thickness 3cm - gluing to be tested
      • do need an area with different surface roughness under gas manifold, or a small trench
      • keep naming (A, B) to distinguish the two sides of the detector, apply or HV boards too
      • prepared a grounding half-ring soldered to copper cladded kapton foil (shielding, wrapped around the support tube)
      • Francois will provide the dimensions for holes

       

      Peter: 

      • HV board can be send for production before Christmas, the last thing missing is a confirmation from Vincent that the extension of the board is OK
      • need to add a feedthrough connector on the fixation plate

       

      Zuzana:

      • need to launch the production of crimp tubes with Minitubes
      • need to launch the development of metallized plastic parts with DTI 

       

      Hans:

      • Tonio et Francois will test the gluing of straws in a thicker flange
      • Rui will try to gold-plate plastic parts