PUMA@ISOLDE #11

Europe/Zurich
508/1-001 (CERN)

508/1-001

CERN

20
Show room on map
Description

Preparation for the installation and commissioning

Zoom Meeting ID
65558309316
Host
Lukas Nies
Useful links
Join via phone
Zoom URL
    • 1
      WP1: Management and Coordination 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Erwin Siesling (CERN), Oliver Aberle (CERN)
      • Introduction for scope of this meeting: preparation for upcoming installation phase
      • Current situation of the installation, rough timeline until desired handover of the machine by the end of Q2 2025
    • 2
      PUMA and RC7 508/1-001

      508/1-001

      CERN

      20
      Show room on map

      News from PUMA

      Speakers: Mark Julian Kirschbaum (CERN, Technische Universitaet Darmstadt (DE)), et al.

      absent

    • 3
      WP2: The RC6 beam line 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Pablo Arrutia (CERN), et. al.
      • Implementation of an optical model to electrostatically decelerate the beam for treatment on the HT platform implemented, optics not optimized yet
      •  
    • 4
      WP3: Vacuum 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speaker: Dr Jose Antonio Ferreira Somoza (CERN)
      • Delivery of chambers mid of October
      • Budget total so far about 310 kCHF, a bit less than previously estimated
      • Second ISOLDE style quadrupole doublet now under vacuum acceptance test 
      • PLEASE SEND REQUEST FOR VACUUM SIGNALS TO VSC SOON!!
    • 5
      WP4: Beam instrumentation 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Chiara Pasquino (CERN), Federico Roncarolo (CERN), Miguel Martin Nieto (CERN)
      • most parts apart from actuators delivered
      • Vacuum tanks of HIE-ISOLDE type, feedthroughs are being welded and cleaned
      • Next steps are calibrations, calibration stands ready to receive DBs soon
      • New BI electronics racks installed on Mezzanine, now waiting for cabling
      • Electronics discriminator board prototype tested with real signals in YOL2 and approved, switching between TDC readout and PAM readout within 2s
      • Software FESA protoype currently under testing in BI lab and YOL2 with real signals, spare set of FEC and TDC deployed in YOL2 for R&D
      • Delivery of DBs now forseen for December, will come straigtht from vacuum acceptance tests -> separate meeting for scheduling of delivery  
      • Most budget spent (about 350kCHF), only cabling part remaining 
    • 6
      WP5: Handling and transport 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speaker: Roberto Rinaldesi (CERN)

      No news

    • 7
      WP6: BEAM optics and elements 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Lukas Nies (CERN), Magdalena Kowalska (CERN)
    • 8
      Not covered by the WPs 508/1-001

      508/1-001

      CERN

      20
      Show room on map

      Cabling, racks, IT, Timing, Software
      Survey

      Speakers: Antje Behrens (CERN), Ioan Kozsar (CERN), Nicolas Chritin (Unknown), Patrick Rene Gallay (CERN)
    • 9
      Summay and outlook 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speaker: Oliver Aberle (CERN)