Description

Update on the progress of the Study, Integration and Implementation of the new RC6 beam line towards PUMA

    • 10:00 → 10:10
      WP1: Management and Coordination 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Erwin Siesling (CERN), Oliver Aberle (CERN)
    • 10:10 → 10:20
      PUMA and RC7 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map

      News from PUMA

      Speakers: Mark Julian Kirschbaum (CERN, Technische Universitaet Darmstadt (DE)), et al.
      • Successfully tested different components (vacuum, TPC, trap electrodes)
      • Focus for next weeks: get beam permit, cooling magnet, take antiproton beam this summer
      • Design for transfer beamline between RC6 and PUMA main frame finished (consists of pulsed drift tube, quadrupole lenses and Einzel lenses)
      • RC7 and experimental zone was presented earlier to the ISOLDE integration meeting, zone needs power, cooling water, pressurized air
      • Proposed timeline: start beam at AD as soon as possible, installation of RC7 starting in summer, to be finished in Q4 2025, commissioning of RC6 and RC7 slated for Q1/2 in 2026, test transport or real transport planned for Q2/3 2026. -> co-activities during the earlier ISOLDE LS3 to be coordinated with the ISOLDE LS3 activities 
    • 10:20 → 10:30
      WP2: The RC6 beam line 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Pablo Arrutia (CERN), et. al.
      • ZQNAs are ready, but kept on storage until installation in the machine (need one week of preparation)
      • Layout DB to be done by BE-OP and BE-CSS 
      • Simulation of the dynamic part of the beamline operation to be discussed offline
    • 10:30 → 10:40
      WP3: Vacuum 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speaker: Dr Jose Antonio Ferreira Somoza (CERN)
      • Procurement well under way, many pieces available already or expected soon
      • Vacuum acceptance tests: first QP tested (outgasses a lot since it is the standard design), bender was tested and accepted, zqna's were already tested before being stored 
      • Vacuum layout is 100% defined, to solve helium propagation probelem, two extra irises were added to the design, booster turbo pumps added to last two turbo pumps for better compression ratio
      • Installation planned for end of 2025, pending on availablity for all beamline equipments; 
      • Request for collecting vacuum signals required by users (PLCs, etc)
      • Still need to define where to place primary pumps
    • 10:40 → 10:50
      WP4: Beam instrumentation 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Chiara Pasquino (CERN), Federico Roncarolo (CERN), Miguel Martin Nieto (CERN)
      • Parts are being machined, components are ordered
      • Parts delivery slated for september
      • Assembly, calibration, ~ 1.5 months -> tentative delivery date in November ' 25; collector plates probably Q1 2026
      • Calibration setup to be reused from HIE-ISOLDE DBs 
      • Racks already installed on mezzannine, TDC is installed, FESA class still needs to be adapted
      • MagneToF high-gain and low-gain modes needed new developements, ongoing, will be integrated in already available PAM infrastructure
      • FESA class requirements discussed with users, is feasible with provided hardware
    • 10:50 → 11:00
      WP5: Handling and transport 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speaker: Roberto Rinaldesi (CERN)

      - no updates from transport as further information on weight distribution of the final PUMA layout is needed to design ISOLDE load spreader (at least 3 months lead time)

    • 11:00 → 11:10
      WP6: BEAM optics and elements 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Lukas Nies (CERN), Magdalena Kowalska (CERN)
      • all of the mounts are installed
      • optics are in the process of being vacuum tested and installed
      • high-voltage cage design is progressing
    • 11:10 → 11:40
      Not covered by the WPs 30m 508/1-001

      508/1-001

      CERN

      20
      Show room on map

      Design work (e.g. supports)
      Cabling, racks, IT, Timing, Software
      Survey

      Speakers: Antje Behrens (CERN), Ioan Kozsar (CERN), Nicolas Chritin (Unknown), Patrick Rene Gallay (CERN)
    • 11:40 → 11:50
      Summay and outlook 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speaker: Oliver Aberle (CERN)