Agenda:
- Short prototype news
- website: https://strwprot.web.cern.ch
- tested several combinations of ROBs
- conclusion so far: RO on both sides preferred
- Intermediate prototype news
- Update on electronics
- need to produce mirror boards
- HV board for the long prototype to be modified at PCB workshop
- Update on design and drawings
- updated drawigns for spacer fixation (long prototype)
- unified drawings of board spacers
- Long prototype news
- the support tube with glued flanges was moved into the new lab
- straw fixation plates to be cleaned at CERN
- gas manifolds ordered and should arrive soon
- gluing tools
- plates still missing
- other parts received and measured - OK
- need to finalize spacer fixation and order related parts
- waiting for HV cap and plug prototypes - lost?
- new straws to be pressurized
- need more space
- glue witness board
- straw database (numbering, info about pressurization, ...)
- find storage solution
- Lab news
- AC to be installed soon
- cleaning to be done afterwards
- gas panel finished, waiting for the bottle
- FCC (Michal K.)
There are minutes attached to this event.
Show them.