Speaker
Emilia Basile
Description
In the TOP-IMPLART project framework (a joint project between ENEA, ISS and IFO), several simulations have been carried out on the ENEA GRID infrastructure, in order to place the basis for the development of a fast Treatment Plan System (TPS) and in order to develop the accelerator beam monitor system. Fluka parallelization has been performed, allowing run on GRID infrastructure and reducing greatly the computing time.