Conveners
C3PoB - Cryo Controls
- Liujin Pei (Fermi National Accelerator Laboratory)
- Renzhuo Wang (SLAC)
-
Torsten Boeckmann (DESY)01/07/2015, 09:00CEC-15 - Instrumentation and ControlsPoster PresentationThe European XFEL project launched on June 5, 2007 will require four large cryogenic distribution boxes, two smaller cryogenic boxes, five feed- and end caps and six string connection boxes for the cryogenic system. For operating and diagnostic all cryogenic instrumentation is connected to Profibus. The cryogenic boxes are manufactured by several companies inside and outside of Europe. All...Go to contribution page
-
Mr Liujin Pei (Fermi National Accelerator Laboratory)01/07/2015, 09:00CEC-15 - Instrumentation and ControlsPoster PresentationThe Muon Campus (MC) is able to measure muon g-2 with high precision and comparing its value to the theoretical prediction. The MC has four 300 KW screw compressors, four liquid helium refrigerators. The centerpiece of the muon g-2 experiment at Fermilab is a large, 50-foot-diameter superconducting muon storage ring. This one-of-a-kind ring, made of steel, aluminum and superconducting wire,...Go to contribution page