28 June 2015 to 2 July 2015
JW Marriott Starr Pass Resort
Etc/GMT-7 timezone

Session

C2OrE - Cryogenic Systems II

C2OrE
30 Jun 2015, 16:00
JW Marriott Starr Pass Resort

JW Marriott Starr Pass Resort

Tucson, Arizona USA

Conveners

C2OrE - Cryogenic Systems II

  • Arkadiy Klebaner (Fermilab)
  • Xilong Wang (European Spallation Source ESS AB)

Presentation materials

There are no materials yet.

  1. Mr Wolfgang Hees (European Spallation Source ESS AB)
    30/06/2015, 16:00
    CEC-01 - Large-Scale Refrigeration and Liquefaction
    Contributed Oral Presentation
    The European Spallation Source (ESS) is an intergovernmental project building a multidisciplinary research laboratory based upon the world’s most powerful neutron source to be built in Lund, Sweden. The ESS will use a linear accelerator which will deliver protons with 5 MW of power to the target at 2.0 GeV with a nominal current of 62.5 mA. A cryomodule test stand will be supplied with helium...
    Go to contribution page
  2. Mr Jan Hildenbeutel (Linde Kryotechnik AG)
    30/06/2015, 16:15
    CEC-02 - Large-Scale Systems, Facilities, and Testing
    Contributed Oral Presentation
    In order to test the fast-ramped superconducting magnets for FAIR (Facility for Antiproton and Ion Research), a cryogenic test facility with an equivalent overall capacity of 1.5 kW at 4.4 Kelvin was designed and commissioned at GSI Helmholzzentrum für Schwerionenforschung GmbH. For efficient testing of the 108 dipole magnets the cryogenic infrastructure consists of a refrigeration system and...
    Go to contribution page
  3. Dr Tripti Sekhar Datta (Inter- University Accelerator Centre. New Delhi. India)
    30/06/2015, 16:30
    CEC-02 - Large-Scale Systems, Facilities, and Testing
    Contributed Oral Presentation
    The heavy ion superconducting linear accelerator as a booster of 15 UD pelletron accelerator is commissioned and operating for more than a year. The acceleration is achieved by a series of superconducting quarter wave bulk niobium cavities at 4.2 K. In the first phase, accelerator was partly commissioned with 8 cavities in first linac cryomodule along with superbuncher and rebuncher. In the...
    Go to contribution page
  4. Holger Kollmus (GSI Helmholtzzentrum für Schwerionenforschung GmbH)
    30/06/2015, 16:45
    CEC-02 - Large-Scale Systems, Facilities, and Testing
    Contributed Oral Presentation
    At the site of the GSI Helmholtzzentrum für Schwerionenforschung in Darmstadt (Germany) the international accelerator Facility for Antiproton and Ion Research (FAIR) is currently under construction. FAIR is going to be one of the largest research facilities worldwide. In its accelerator chain there will be two large machines with superconducting magnets, the heavy-ion synchrotron SIS100 and...
    Go to contribution page
  5. Simon CRISPEL (AIR LIQUIDE)
    30/06/2015, 17:00
    CEC-01 - Large-Scale Refrigeration and Liquefaction
    Contributed Oral Presentation
    The Turkish Accelerator and Radiation Laboratory in Ankara (TARLA) is proposed as the first facility of Turkish Accelerator Center (TAC) Project. It aims to be the first user laboratory in the region of Turkey in which both electromagnetic radiation and particles will be used. Main purpose of the facility is to use IR FEL for research in material science, nonlinear optics, semiconductors,...
    Go to contribution page
  6. Thomas Eisel (GSI)
    30/06/2015, 17:15
    CEC-02 - Large-Scale Systems, Facilities, and Testing
    Contributed Oral Presentation
    In the coming years a new international accelerator Facility for Antiproton and Ion Research (FAIR), one of the largest research projects worldwide, will be build close to Darmstadt in Germany. FAIR will provide antiproton and ion beams with unprecedented intensity and quality. One of its major accelerators will be the SIS100 having a circumference of about 1100 meters. The SIS100 tunnel will...
    Go to contribution page
  7. Mr David Grillot (Air liquide)
    30/06/2015, 17:30
    CEC-02 - Large-Scale Systems, Facilities, and Testing
    Contributed Oral Presentation
    What was the last year Helium market figure ? How has changed the worldwide Helium sourcing balance and "center of gravity" ? Do we have to expect a continuous shortage period for the next 10 years or, on the contrary, will the market be over-supplied by the next coming large scale production units ? Facts will be presented on all these questions, view is given by Air Liquide, one of...
    Go to contribution page
Building timetable...