SPS CCTC

Europe/Zurich
252/1-046 - Salle Reunion RF (CERN)

252/1-046 - Salle Reunion RF

CERN

18
Show room on map
Description

Working group meeting dealing with the SPS crab cavity installation. This meeting is devoted to short reports (10 -15 min) from

  • Cryo infrastructure: Krzysztof
  • RF power: Eric
  • LLRF: Philippe
  • Controls: Luca

Each report should consider:

  • description of what is foreseen for your system and status/schedule to date
  • description of needed services and interfaces with other systems or components
  • estimate of infrastructure footprint ( both at the cryo-module, and at control room or surface building)