Conveners
Implementation, Electricity, Cooling and Ventilation
- Philippe Lebrun (CERN)
Charlie Cook
(CERN)
14/04/2016, 13:30
Infrastructure and Operation
Oral
This presentation describes how CERN’s civil engineering team are investigating the optimal position for the FCC underground structures in the Geneva area.
A 3D geological model contained within bespoke web-based systems has enabled the position of the FCC underground structures to be narrowed down to two options. The feasibility of these alternative locations has been assessed from a civil...
Mark Jones
(CERN)
14/04/2016, 13:48
Infrastructure and Operation
Oral
The Large Scale Metrology work plan established for the FCC CDR will be presented. Our studies are concentrated on those aspects which present new challenges. The resources required to prepare the CDR, and the progress to date, as well as an overview of the survey activities for a new project of this type will be presented.
The Survey team is implicated in all stages of the assembly and...
Davide Bozzini
(CERN)
14/04/2016, 14:06
Infrastructure and Operation
Oral
This paper discusses various design aspects of a large scale electrical network infrastructure for the Future Linear Collider (FCC), a 100 km long circular accelerator, under feasibility evaluation. The key requirements are very reliable, redundant and operable electrical networks granting the highest accelerator availability. Firstly, the required types of electrical networks are identified...
Maria Mylona
(CERN)
14/04/2016, 14:24
Infrastructure and Operation
Oral
The design of the electrical network for the supply of the Future Linear Collider (FCC), a 100 km long circular accelerator under feasibility evaluation, relies on the identification, classification and geographical location of the electrical power requirements. This paper presents a methodology for the data collection and geographical mapping of the power requirements. First, the systems of...
Mauro Nonis
(CERN)
14/04/2016, 14:42
Infrastructure and Operation
Oral
Although several options are still open for the general layout of the FCC, a proposal for the future configuration of the cooling and ventilation plants can be made. Some of the specificities of the FCC such as the underground depth of the tunnel leads to additional constraints for the construction and design of the systems. The ventilation system has to comply with the technical and safety...