11–12 Dec 2008
CERN
Europe/Zurich timezone

Contribution List

65 out of 65 displayed
Export to PDF
  1. Lyn Evans
    11/12/2008, 09:00
  2. Roland garoby
    11/12/2008, 09:10
  3. Frank Gerigk
    11/12/2008, 09:30
  4. Stephane Chel (Centre d'Etudes de Saclay (CEA-Saclay))
    11/12/2008, 10:20
  5. Patxi Duthil (IPNO - IN2P3 - CNRS)
    11/12/2008, 10:40
  6. Rick Baartman, Robert Laxdal
    11/12/2008, 11:00
  7. Amos Dexter
    11/12/2008, 11:20
  8. Ilan Ben-Zvi, Rama Buchi Rao Calaga
    11/12/2008, 11:40
  9. Roland garoby
    11/12/2008, 12:00
  10. 11/12/2008, 14:00
  11. Frank Gerigk
    11/12/2008, 14:00
    Make recommendation on geometrical beta based on beam dynamics issues, in view of the impact on power dissipation, max. gradient, and required equipment (high pressure water rinsing, electropolishing, ...)
    Go to contribution page
  12. Edmond Ciapala (CERN)
    11/12/2008, 14:00
  13. 11/12/2008, 14:15
  14. 11/12/2008, 14:15
    Other design issues: Optimize cavity geometry w.r.t. peak fields, multipactor, robustness against Lorentz-force detuning, tunability, HOM spectra, cross-talk between cavities (from HOM or electron propagation, ...) Identify potential contributers and deadlines
    Go to contribution page
  15. DANIEL VALUCH (CERN)
    11/12/2008, 14:15
  16. Joachim Tuckmantel (CERN)
    11/12/2008, 14:30
  17. 11/12/2008, 14:35
    Items for discussion: - Understand limits of scope of CEA and CNRS contributions; - Identification of integration needs: components type, interfaces, functional needs; - Identify uncovered items and possible distribution to institutes interested
    Go to contribution page
  18. Amos Dexter
    11/12/2008, 14:45
  19. Hans-Walter Glock
    11/12/2008, 14:50
  20. Joachim Tuckmantel
    11/12/2008, 15:10
  21. 11/12/2008, 15:30
    Possible issues: - Acquire results on HOM impedances, beam instability studies, and interaction between cavities via HOM propagation - Define strategy on HOM coupler design, prototyping and testing - Design HOM coupler (antenna vs. beam tube absorber), and cooling layout - Perform multipactor studies - Identify manufacture capacities - Identify required equipment for HOM coupler tests...
    Go to contribution page
  22. Mohammad Eshraqi
    11/12/2008, 16:00
  23. Carlos De Almeida Martins (CERN)
    11/12/2008, 16:00
  24. 11/12/2008, 16:00
  25. Sergio Calatroni (CERN)
    11/12/2008, 16:00
    - Define strategy to reach full performance (25 MV/m for beta = 1 cavities) for a fully equipped prototype cryomodule - Identify required equipment (e.g. electro-polishing, HPWR) and what is missing
    Go to contribution page
  26. 11/12/2008, 16:15
  27. 11/12/2008, 16:20
    - Type of coupler, integration needs, mechanical interface - Type of tuner, integration needs, interface to cavity helium vessel - Magnetic shielding design & integration (internal? external?) - Alignment requirements and assembly principles - cryogenics distribution architecture: general requirements and possible schemes, slope, H/W related issues (ex. Technical Service Modules) - Table...
    Go to contribution page
  28. Pierre Maesen (CERN)
    11/12/2008, 16:20
    Identify need of re-processing and re-testing, the equipment required and what is missing
    Go to contribution page
  29. Mats Lindroos
    11/12/2008, 16:30
  30. 11/12/2008, 16:40
    Potential manufacturers and required equipment - Identify potential Labs with manufacturing competence (in house or with industry) - Identify potential commercial manufacturers - Agree on manufacturing and processing sequence - Identify required equipment (e.g. field flatness, frequency tuning) and what equipment is missing Diagnostic equipment - Define required equipment (on-line:...
    Go to contribution page
  31. Edmond Ciapala (CERN)
    11/12/2008, 16:40
  32. 11/12/2008, 16:45
  33. 11/12/2008, 17:00
  34. 11/12/2008, 17:15
  35. 11/12/2008, 17:20
  36. Roland garoby
    12/12/2008, 08:30
  37. 12/12/2008, 09:00
  38. Pierre Maesen (CERN)
    12/12/2008, 11:00
    - Identify required equipment, monitoring devices and what is missing - Address issue whether we need to simulate the slope of the tunnel
    Go to contribution page
  39. Juan FERNANDEZ-HERNANDO (STFC)
    12/12/2008, 11:00
  40. Edmond Ciapala (CERN)
    12/12/2008, 11:00
  41. 12/12/2008, 11:15
  42. guillaume devanz
    12/12/2008, 11:15
  43. Edmond Ciapala (CERN)
    12/12/2008, 11:20
  44. Slawomir Wronka (Soltan Institute)
    12/12/2008, 11:30
  45. Eric Montesinos (CERN)
    12/12/2008, 11:30
  46. 12/12/2008, 11:45
  47. guillaume devanz
    12/12/2008, 11:45
  48. 12/12/2008, 12:00
    Power coupler: - Define the conceptual design, the layout of cooling (including thermal loads) and diagnostical tools, choice of materials (waveguide, window) - Perform multipactor studies, assess methods of multipactor suppression and elaborate coating techniques - Acquire data on the secondary emission coefficient (SEC) of materials involved - Identify manufacture and conditioning...
    Go to contribution page
  49. 12/12/2008, 12:00
  50. 12/12/2008, 12:15
  51. Amos Dexter, Edmond Ciapala (CERN)
    12/12/2008, 16:00
  52. Stephane Chel (Centre d'Etudes de Saclay (CEA-Saclay)), Wolfgang Weingarten (CERN)
    12/12/2008, 16:20
  53. Patxi DUTHIL (IPNO - IN2P3 - CNRS), Vittorio Parma (CERN)
    12/12/2008, 16:40
  54. Frank Gerigk, Rick Baartman
    12/12/2008, 17:00
  55. Roland garoby
    12/12/2008, 17:20
  56. Objective: - Define required equipment (on-line: Temperature mapping and other diagnostics methods in super-fluid helium) and what is missing - Define required equipment (off-line: Optical inspection system) and what is missing
    Go to contribution page
  57. Amos Dexter, Edmond Ciapala (CERN)