-
Lyn Evans11/12/2008, 09:00
-
Roland garoby11/12/2008, 09:10
-
Frank Gerigk11/12/2008, 09:30
-
Stephane Chel (Centre d'Etudes de Saclay (CEA-Saclay))11/12/2008, 10:20
-
Patxi Duthil (IPNO - IN2P3 - CNRS)11/12/2008, 10:40
-
Rick Baartman, Robert Laxdal11/12/2008, 11:00
-
Amos Dexter11/12/2008, 11:20
-
Ilan Ben-Zvi, Rama Buchi Rao Calaga11/12/2008, 11:40
-
Roland garoby11/12/2008, 12:00
-
11/12/2008, 14:00
-
Frank Gerigk11/12/2008, 14:00Make recommendation on geometrical beta based on beam dynamics issues, in view of the impact on power dissipation, max. gradient, and required equipment (high pressure water rinsing, electropolishing, ...)Go to contribution page
-
Edmond Ciapala (CERN)11/12/2008, 14:00
-
11/12/2008, 14:15
-
11/12/2008, 14:15Other design issues: Optimize cavity geometry w.r.t. peak fields, multipactor, robustness against Lorentz-force detuning, tunability, HOM spectra, cross-talk between cavities (from HOM or electron propagation, ...) Identify potential contributers and deadlinesGo to contribution page
-
DANIEL VALUCH (CERN)11/12/2008, 14:15
-
Joachim Tuckmantel (CERN)11/12/2008, 14:30
-
11/12/2008, 14:35Items for discussion: - Understand limits of scope of CEA and CNRS contributions; - Identification of integration needs: components type, interfaces, functional needs; - Identify uncovered items and possible distribution to institutes interestedGo to contribution page
-
Amos Dexter11/12/2008, 14:45
-
Hans-Walter Glock11/12/2008, 14:50
-
Joachim Tuckmantel11/12/2008, 15:10
-
11/12/2008, 15:30Possible issues: - Acquire results on HOM impedances, beam instability studies, and interaction between cavities via HOM propagation - Define strategy on HOM coupler design, prototyping and testing - Design HOM coupler (antenna vs. beam tube absorber), and cooling layout - Perform multipactor studies - Identify manufacture capacities - Identify required equipment for HOM coupler tests...Go to contribution page
-
Mohammad Eshraqi11/12/2008, 16:00
-
Carlos De Almeida Martins (CERN)11/12/2008, 16:00
-
11/12/2008, 16:00
-
Sergio Calatroni (CERN)11/12/2008, 16:00- Define strategy to reach full performance (25 MV/m for beta = 1 cavities) for a fully equipped prototype cryomodule - Identify required equipment (e.g. electro-polishing, HPWR) and what is missingGo to contribution page
-
11/12/2008, 16:15
-
11/12/2008, 16:20- Type of coupler, integration needs, mechanical interface - Type of tuner, integration needs, interface to cavity helium vessel - Magnetic shielding design & integration (internal? external?) - Alignment requirements and assembly principles - cryogenics distribution architecture: general requirements and possible schemes, slope, H/W related issues (ex. Technical Service Modules) - Table...Go to contribution page
-
Pierre Maesen (CERN)11/12/2008, 16:20Identify need of re-processing and re-testing, the equipment required and what is missingGo to contribution page
-
Mats Lindroos11/12/2008, 16:30
-
11/12/2008, 16:40Potential manufacturers and required equipment - Identify potential Labs with manufacturing competence (in house or with industry) - Identify potential commercial manufacturers - Agree on manufacturing and processing sequence - Identify required equipment (e.g. field flatness, frequency tuning) and what equipment is missing Diagnostic equipment - Define required equipment (on-line:...Go to contribution page
-
Edmond Ciapala (CERN)11/12/2008, 16:40
-
11/12/2008, 16:45
-
11/12/2008, 17:00
-
11/12/2008, 17:15
-
11/12/2008, 17:20
-
Roland garoby12/12/2008, 08:30
-
12/12/2008, 09:00
-
Pierre Maesen (CERN)12/12/2008, 11:00- Identify required equipment, monitoring devices and what is missing - Address issue whether we need to simulate the slope of the tunnelGo to contribution page
-
Juan FERNANDEZ-HERNANDO (STFC)12/12/2008, 11:00
-
Edmond Ciapala (CERN)12/12/2008, 11:00
-
12/12/2008, 11:15
-
guillaume devanz12/12/2008, 11:15
-
Edmond Ciapala (CERN)12/12/2008, 11:20
-
Slawomir Wronka (Soltan Institute)12/12/2008, 11:30
-
Eric Montesinos (CERN)12/12/2008, 11:30
-
12/12/2008, 11:45
-
guillaume devanz12/12/2008, 11:45
-
12/12/2008, 12:00Power coupler: - Define the conceptual design, the layout of cooling (including thermal loads) and diagnostical tools, choice of materials (waveguide, window) - Perform multipactor studies, assess methods of multipactor suppression and elaborate coating techniques - Acquire data on the secondary emission coefficient (SEC) of materials involved - Identify manufacture and conditioning...Go to contribution page
-
12/12/2008, 12:00
-
12/12/2008, 12:15
-
Amos Dexter, Edmond Ciapala (CERN)12/12/2008, 16:00
-
Stephane Chel (Centre d'Etudes de Saclay (CEA-Saclay)), Wolfgang Weingarten (CERN)12/12/2008, 16:20
-
Patxi DUTHIL (IPNO - IN2P3 - CNRS), Vittorio Parma (CERN)12/12/2008, 16:40
-
Frank Gerigk, Rick Baartman12/12/2008, 17:00
-
Roland garoby12/12/2008, 17:20
-
-
Objective: - Define required equipment (on-line: Temperature mapping and other diagnostics methods in super-fluid helium) and what is missing - Define required equipment (off-line: Optical inspection system) and what is missingGo to contribution page
-
-
-
Amos Dexter, Edmond Ciapala (CERN)
-
-
-
-
-
Choose timezone
Your profile timezone: